This technical report, published by the World Bank, provides detailed guidance on natural capital accounting for water resources in Lao PDR, covering the years 2019-2020 with basin-level data and 2023-2025 with modelling data. It introduces the System of Environmental-Economic Accounting (SEEA) framework and outlines three compilation approaches: yearly accounts for three specific basins, monthly accounts by province, and monthly accounts for all basins nationwide. The report includes key findings on rainfall, evapotranspiration, runoff, and soil water variability, with figures and tables illustrating trends since 2000. It is intended for policymakers, statisticians, and environmental analysts involved in natural capital accounting, offering practical methods and strategic considerations for the Lao Statistics Bureau and government. The document also provides a data inventory and appendices detailing the account compilation process, water balance models, and variable descriptions.

Key points

  • The report applies the SEEA framework to compile water resource accounts for Lao PDR, using both observed basin data (2019-2020) and modelled data (2023-2025).
  • Three compilation approaches are presented: yearly accounts for three basins, monthly accounts by province, and monthly accounts for all basins, each with distinct methods and results.
  • Key findings include significant variability in rainfall, evapotranspiration, runoff, and soil water across basins and seasons, with trends since 2000 highlighted.
  • The report offers strategic considerations for the Lao Statistics Bureau and government to improve natural capital accounting implementation.

Written by DocuLuma editors from the document's full text.

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 1

Page 1 of 83 · Preview

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 2

Page 2 of 83 · Preview

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 3

Page 3 of 83 · Preview

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 4

Page 4 of 83 · Preview

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 5

Page 5 of 83 · Preview

Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources - 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 83. Download the original document to read the full content.

⬇ Download document

Page 6 of 83 · End of preview

The full document has 83 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

Technical Report Accounting for Water resources | 1 P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed Technical Report Accounting for Water resources | 2 © 2026 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved. This work is a product of the staff of the World Bank with external contributions.

The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of the World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered a limitation upon or waiver of the privileges and immunities of the World Bank, all of which are specifically reserved.

Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CCBY 3.0 IGO) http:// creativecommons. org/licenses/by/3.0/igo. Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution—World Bank. Technical Guidance on Natural Capital Accounting in Lao PDR: Technical Report Accounting for Water resources- 2019 and 2020-Basin data and 2023, 2024 and 2025-Modelling data. Washington, DC: World Bank. 2026.

License: Creative Commons Attribution CC BY 3.0 IGO Translations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by the World Bank and should not be considered an official World Bank translation. the World Bank shall not be liable for any content or error in this translation. Adaptations—If you create an adaptation of this work, please add the following disclaimer along with the attribution: This is an adaptation of an original work by the World Bank.

Views and opinions expressed in the adaptation are the sole responsibility of the author or authors of the adaptation and are not endorsed by the World Bank. Third-party content—The World Bank does not necessarily own each component of the content contained within the work. The World Bank therefore does not warrant that the use of any third-party owned individual component or part contained in the work will not infringe on the rights of those third parties. The risk of claims resulting from such infringement rests solely with you.

If you wish to re-use a component of the work, it is your responsibility to determine whether permission is needed for that re-use and to obtain permission from the copyright owner. Examples of components can include, but are not limited to, tables, figures, or images. All queries on rights and licenses should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; e-mail: [email protected].

Design & Layout— Insmai Photo — front cover – Insmai | Page 8, 10, 15, 23, 27, 58, 62, 67 – World Bank Group | Page 20 - Darko Mlinarevic | Page 27, 41, 73 – insmai, Page 41 – Mykhailo Petrushchak | Page 65 – Sritakoset Technical Report Accounting for Water resources | 3 Contents Context ...................................................................................... 5 Introduction to Natural Capital Accounting ......................... 10 Overview........................................................................... 10 The System of Environmental-Economic Accounting ... 12 Implementing Natural Capital Accounting ....................

13 Summary of results ................................................................ 15 Policy connections ........................................................... 15 Key findings ...................................................................... 16 Findings from the accounting process .......................... 17 Strategic considerations for LSB and Government ...... 19 The Water System in Lao PDR ............................................... 20 General approach to water resource accounting ................ 23 Account description......................................................... 24 Considerations for account compilation .......................

24 Account scope .................................................................. 25 Approach adaptation and evolution .............................. 27 Compilation approach 1: Yearly accounts for 3 basins ....... 28 Introduction ..................................................................... 29 Results .............................................................................. 29 Method ............................................................................. 33 Technical Report Accounting for Water resources | 4 Compilation approach 2: Monthly accounts by province ... 34 Introduction .....................................................................

34 Results .............................................................................. 34 Method ............................................................................. 39 Compilation approach 3: Monthly accounts for all basins, Lao PDR .......................................................................................... 47 Introduction ..................................................................... 47 Results .............................................................................. 48 Method ............................................................................. 60 Data inventory ........................................................................

65 Appendix A: Account compilation process ........................... 68 Appendix B: Water balance models ...................................... 70 Appendix C: Variable descriptions ........................................ 72 Precipitation ..................................................................... 72 Evapotranspiration .......................................................... 73 Appendix D: Land surface models ........................................ 74 Appendix E: Runoff and Soil Water results ........................... 75 Technical Report Accounting for Water resources | 5 Figures Figure 1.

Tiers for data and methods, and assessments of confidence ................................................13 Figure 2. Total monthly rainfall by provincial groups, million cubic metres.........................................16 Figure 3. Total evapotranspiration for Vientiane (province 1), for wet and dry season rice.............17 Figure 4. The water system diagram .............................................................................................................22 Figure 5. Numnguem River basin, 2019, million cubic metres ................................................................32 Figure 6.

Sekong River basin, 2020, million cubic metres .........................................................................32 Figure 7. Num Ou River basin, 2020, million cubic metres.......................................................................32 Figure 8. Total monthly rainfall by provincial groups, million cubic metres.........................................35 Figure 9. Average monthly rainfall by provincial groups, millimetres ...................................................36 Figure 10. Monthly evapotranspiration for rice in the wet season, province 01 (Vientiane) ............37 Figure 11.

Monthly evapotranspiration for rice in the dry season, province 01 (Vientiane) .............38 Figure 12 Total evapot …

Related documents

Will open at the source site: World Bank Open Knowledge Repository