Are Power Utilities in Tonga and New Zealand Resilient?

Are Power Utilities in Tonga and New Zealand Resilient? — page 1

Page 1 of 4 · Preview

Are Power Utilities in Tonga and New Zealand Resilient? — page 2

Page 2 of 4 · Preview

Are Power Utilities in Tonga and New Zealand Resilient? — page 3

Page 3 of 4 · Preview

Are Power Utilities in Tonga and New Zealand Resilient? — page 4

Page 4 of 4 · Preview

The full document has 4 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

The boTTom line Given the increasing frequency and severity of extreme weather events, it is useful to understand the lessons learned from recent natural disasters in Ha’apai, Tonga, and Christchurch, New Zealand. Despite vastly different circumstances, the two experiences demonstrate that power outages can be shortened through access to adequate human resources, immediate and frequent communication with the public, good pre-disaster maintenance, and standardized equipment. By attending to these factors, utilities can become more resilient and help communities recover more quickly. Ray Brown is director for transmission and distribution at AECOM Auckland.

Xiaoping Wang is a senior energy specialist at the World Bank. Christopher Page is an MPA candidate at the Woodrow Wilson School of Public and International Affairs at Princeton University. Are Power Utilities in Tonga and new Zealand Resilient? human and organizational Factors in Disaster Response Why is this issue important? natural disasters are increasingly frequent, costly, and disruptive Natural disasters have become more frequent over the past 20 years, and the costs of the damages and losses associated with them are rising. At the same time, the world is increasingly reliant on electricity, and the population expects reliable, stable, and secure services.

Natural disasters affect power utilities with varying levels of severity that depend on each utility’s natural environment. Disasters that can have a major impact on power generation, transmission, distribution, or control include earthquakes, tsunamis, volcanoes, cold spells, heat waves, storms, tropical cyclones, heavy snowfalls, floods, droughts, and wildfires. In the United States, a 2012 estimate from the Department of Energy showed that between 2008 and 2012, annual costs due to weather-related power outages ranged from $25 billion to $70 billion.

These figures are derived from business costs associated with lost output, residential customers’ willingness to pay to avoid outages, and other types of lost economic output. Hurricane Sandy alone cost the U.S. economy between $14 and $26 billion. In Thailand, the 2011 floods cost the power sector $285 million in damages and losses and another $180 million to recover and reconstruct. In most disasters, a certain degree of damage to power system components is unavoidable; however, steps can be taken to reduce the impact and length of the resulting power outages.

Here we look at how major disasters in Tonga and New Zealand affected power systems and what the power authorities learned about the human and organizational factors that played a part in the recovery efforts. This brief is based on interviews and research carried out by the authors for a global study (to be published in February 2016) of how the power sector can be made more resilient to weather and geological risks. Of course, the expectations and requirements of a largely rural, remote island community in a developing nation with a small power system and those of a major, interconnected city in a developed country with a much larger power system are different.

The response to Tonga’s Cyclone Ian, which damaged most of the electricity network of the Ha’apai Islands in January 2014, was quite different from the recovery efforts surrounding the February 2011 earthquake in Christchurch, New Zealand. Despite the differences, however, the human and organizational factors of resilience affecting post-disaster management are similar. What challenges were faced? in both Tonga and new Zealand the damage was severe Tonga. On January 10, 2014, Tropical Cyclone Ian hit the Ha’apai Islands of Tonga—home to approximately 7,000 people—with wind gusts of 287 km/h.

The category five cyclone destroyed 82 percent of all buildings and 95 percent of power lines, damaging the only power station and requiring it to undergo major refurbishment. A lack of functioning communications facilities after the event hampered efforts to organize transportation and logistics and to understand the level of assistance required of authorities and staff based on Tonga’s main island. Even when response staff arrived A k n o w l e d g e n o t e s e r i e s f o r t h e e n e r g y p r A c t i c e 2016/59 A k n o w l e d g e n o t e s e r i e s f o r t h e n e r g y & e x t r A c t i v e s g l o b A l p r A c t i c e Are Power Utilities in Tonga and new Zealand Resilient?

102681 2 A r e P o w e r U T i l i T i e s i N T o N G A A N D N e w Z e A l A N D r e s i l i e N T ? “The category five cyclone destroyed 82 percent of all buildings and 95 percent of power lines on the Ha’apai Islands, damaging the only power station and requiring it to undergo major refurbishment.” in Ha’apai, limited communications caused significant delays in support. All on-island landline phones were out of service because the wires went down with the distribution lines.

Cellphone towers and transmission equipment on radio towers (VHF) and their ancillary equipment were damaged, so cellular communication was almost completely cut off for a time, leaving only limited SMS (texting) capability and very limited external communications. It took days to assess the situation, and it was difficult to convey needs back to the head office on Tongatapu, Tonga’s main island. Tonga Power Ltd (TPL), the utility, has now purchased a satellite phone for Ha’apai. After technical personnel and contractors from TPL arrived on the islands, providing shelter, food, water, and power for the respond- ers proved a challenge.

These resources had to be shipped in, which increased response times. Because of these factors, recovery was slow. After nearly two weeks, TPL had restored power to no more than 100 residences. In October 2014, ten months after the disaster, 700 families—almost 50 percent of the population on the islands—were still living in tents. New Zealand. On February 22, 2011, a devastating, shallow earthquake with a 6.3 magnitude struck Christchurch, New Zealand, a prosperous city of approximately 400,000 people, killing 181 and seriously injuring 161 (figure 1).

More than 1,200 buildings in the central business district had to be demolished, and more than 300,000 buildings were damaged, contributing to an estimated $40 billion in damages. The power distribution network faced severe damage from the earthquake. Four of the city’s 314 zone substations were rendered unserviceable owing to ground movement and falling rocks. Most of Christchurch’s 66 kV cables, 15 percent of its 11 kV cables, and 1 percent of its low voltage cables were damaged. About a hundred poles (a relatively small number) were displaced.

As a result, approximately 80 percent of Christchurch’s network was without power after the earthquake; five days after the earthquake, more than 36,000 residents still lacked power. What lessons were learned? lessons reflected differences in circumstances but also interesting similarities Tonga. TPL managers interviewed in 2014 offered suggestions to improve the ability to restore power and make improvements. Pre-disaster maintenance is critical. When Cyclone Ian hit Ha’apai, overhead lines were not in sufficiently good condition to withstand high winds (figure 2), and many poles and line conductors broke.

The network would have been in a better condition after the storm if maintenance practices had followed TPL’s standards. For example, many wooden poles were severely rotten at their bases, and substandard poles had been used in some cases. Figure 1. The city center of Christchurch, New Zealand, just after the 2011 earthquake struck Photo copyright: Gillian Needham. Used by permission. 3 A r e P o w e r U T i l i T i e s i N T o N G A A N D N e w Z e A l A N D r e s i l i e N T ? “Advance planning is needed to ensure that technical responders and their families are kept safe and supplied with water, food, shelter, and emotional support.

Comprehensive support enables responders to work safely and turn in th …