Democratic Republic of Timor-Leste Public Expenditure Review

Washington, DC

Document overview

Original summary

This report, a joint review by the Ministry of Finance and the World Bank, assesses the quality of infrastructure spending in Timor-Leste. It focuses on three key sectors: roads, irrigation, and electricity. The analysis examines past spending trends, budget execution, and the economic returns on these investments. It also evaluates the country's public investment management systems and fiscal sustainability. The document is intended for policymakers, government officials, and development partners seeking to understand the effectiveness of infrastructure investments and improve future planning.

Key points

  • The report analyzes infrastructure spending trends, budget execution, and economic returns in roads, irrigation, and electricity.
  • It evaluates the efficiency of public investment management systems and the fiscal sustainability of current spending policies.
  • A key finding is the need to prioritize managing recurrent costs over building new roads to ensure a stable network.
  • The analysis highlights challenges in project delivery, including financial management and staffing capacity within the Directorate of Roads.
  • For electricity, the report explores cost drivers and strategies to diversify the generation mix to reduce costs.

Written by DocuLuma editors from the document's full text.

Democratic Republic of Timor-Leste Public Expenditure Review — page 1

Page 1 of 202 · Preview

Democratic Republic of Timor-Leste Public Expenditure Review — page 2

Page 2 of 202 · Preview

Democratic Republic of Timor-Leste Public Expenditure Review — page 3

Page 3 of 202 · Preview

Democratic Republic of Timor-Leste Public Expenditure Review — page 4

Page 4 of 202 · Preview

Democratic Republic of Timor-Leste Public Expenditure Review — page 5

Page 5 of 202 · Preview

Democratic Republic of Timor-Leste Public Expenditure Review — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 202. Download the original document to read the full content.

⬇ Download document

Page 6 of 202 · End of preview

The full document has 202 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

i Report No: AUS6142 Democratic Republic of Timor-Leste Public Expenditure Review: Infrastructure A JOINT MINISTRY OF FINANCE AND WORLD BANK REVIEW OF THE QUALITY OF INFRASTRUCTURE SPENDING IN TIMOR-LESTE, FOCUSING ON ROADS, IRRIGATION AND ELECTRICITY MARCH 2015 GMFDR EAST ASIA AND PACIFIC ii Standard Disclaimer: This volume is a product of the staff of the International Bank for Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work.

The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Copyright Statement: The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.

For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978-750-8400, fax 978-750-4470, http://www.copyright.com/. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA, fax 202-522-2422, e-mail [email protected].

iii CONTENTS LIST OF FIGURES ............................................................................................................................vi LIST OF TABLES ............................................................................................................................ viii ACKNOWLEDGEMENTS ................................................................................................................. ix GLOSSARY ......................................................................................................................................

x EXECUTIVE SUMMARY .................................................................................................................. xi CHAPTER 1 MACRO FISCAL ANALYSIS .......................................................................................... 1 1.1 Government Policy ........................................................................................................... 1 1.2 Infrastructure: Initial Conditions ...................................................................................... 6 1.2.1 Initial Conditions: Roads ...........................................................................................

7 1.2.2 Initial Conditions Electricity .................................................................................... 10 1.3 Past Spending, Future Spending and Budget Execution ................................................ 12 1.3.1 Overall Trends in Infrastructure Spending ............................................................. 12 1.3.2 Infrastructure Spending by Program ...................................................................... 14 1.3.3 Budget Execution ...................................................................................................

15 1.4 Outputs from Spending and Unit Costs ......................................................................... 20 1.4.1 Outputs from Spending on Irrigation ..................................................................... 20 1.4.2 Outputs from Spending on Electricity .................................................................... 22 1.4.3 Outputs from Spending on Roads .......................................................................... 24 1.5 Operation and Maintenance .......................................................................................... 24 1.5.1 Operation and Maintenance and Other Recurrent Expenditure on Irrigation ......

24 1.5.2 Operation and Maintenance of Electricity Infrastructure ...................................... 26 1.5.3 Operation and Maintenance: Roads ...................................................................... 27 1.5.4 Operation and Maintenance: Conclusion .............................................................. 29 1.6 Infrastructure and Economic Growth ............................................................................ 30 1.6.1 Theory and International Evidence ........................................................................ 30 1.6.2 Empirical Evidence from Timor-Leste ....................................................................

35 1.6.3 Infrastructure Spending and Employment in Timor-Leste ..................................... 42 1.7 Fiscal Sustainability ........................................................................................................ 42 1.7.1 Background, Importance and Definition of Fiscal Sustainability............................ 42 1.7.2 Fiscal Sustainability Policy ...................................................................................... 44 1.7.3 Scenario 1: High Infrastructure and Recurrent Spending ...................................... 50 1.7.4 Scenario 2: A Sustainable Fiscal Policy ...................................................................

53 1.7.5 Fiscal Sustainability Conclusion .............................................................................. 55 2 CHAPTER 2 PUBLIC INVESTMENT MANAGEMENT IN TIMOR-LESTE .................................. 58 2.1 The SDP Provides an Overarching Framework for Public Investment Driven Growth .. 58 2.2 Overview of Timor-Leste’s institutions for managing the public investment cycle ....... 59 2.3 Results of a Review of Timor-Leste Investment Institutions.......................................... 61 2.4 Conclusion ......................................................................................................................

65 2.5 Recommendations ......................................................................................................... 67 3 CHAPTER 3 IRRIGATION ...................................................................................................... 68 3.1 Summary ........................................................................................................................ 68 3.2 Historical Background .................................................................................................... 70 3.3 Past lessons ....................................................................................................................

70 3.4 Future plans ................................................................................................................... 73 iv 3.5 Current Irrigation Strategy ............................................................................................. 77 3.5.1 Ex post economic appraisal of three Completed Irrigation Schemes .................... 78 3.5.2 Ex ante appraisal of seven approved irrigation schemes ....................................... 81 3.6 The difficulty of achieving imports substitution under the current strategy................. 84 3.7 Financial returns to farmers from growing rice .............................................................

87 3.8 Irrigation Economics: Alternative Strategies .................................................................. 89 3.8.1 Irrigation Operations and Maintenance Budgets ................................................... 97 3.9 Project Cycle Procedures and Compliance with Government Systems ....................... 100 3.9.1 Identification and Se …

Related documents

Will open at the source site: World Bank Open Knowledge Repository