Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport

Washington, DC

Document overview

Original summary

This document presents a case study on the TransMilenio Bus Rapid Transit (BRT) system in Bogota, Colombia. It discusses the project's design, implementation, and the significant impact it has had on urban transportation efficiency. The report highlights the system's role in reducing congestion, improving air quality, and enhancing public safety. It also examines the financial aspects, including the initial investment and the cost-effectiveness of the project. The study is aimed at urban planners, transportation professionals, and policymakers interested in sustainable urban mobility solutions.

Key points

  • The TransMilenio BRT system has significantly reduced travel times and emissions in Bogota.
  • The system has led to a 32% reduction in overall travel time and a 40% reduction in emissions.
  • The project's success is attributed to strong leadership, careful planning, advanced technology, and efficient management.

Written by DocuLuma editors from the document's full text.

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 1

Page 1 of 10 · Preview

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 2

Page 2 of 10 · Preview

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 3

Page 3 of 10 · Preview

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 4

Page 4 of 10 · Preview

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 5

Page 5 of 10 · Preview

Good Practices in City Energy Efficiency : Bogota, Colombia - Bus Rapid Transit for Urban Transport — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 10. Download the original document to read the full content.

⬇ Download document

Page 6 of 10 · End of preview

The full document has 10 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

GOOD PRACTICES IN CITY ENERGY EFFICIENCY Bogota, Colombia – Bus Rapid Transit for Urban Transport Energy Sector Management Assistance Program (ESMAP) reports are published to communicate the results of ESMAP’s work to the development community with the least possible delay. This document has not been prepared in accordance with the procedures appropriate to formal documents. Some sources cited in this paper may be informal documents that are not readily available.

The findings, interpretations, and conclusions expressed in this report are entirely those of the author(s) and should not be attributed in any manner to the World Bank, or its affiliated organizations, or to members of its board of executive directors for the countries they represent, or to ESMAP.

P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed Bogota Case Study November 2009 ESMAP EECI Good Practices in Cities Page 1 Project title TransMilenio BRT in Bogota Sector Urban Transport Type of project Bus Rapid Transit (BRT) City and country Bogota, Colombia City population 8.2 million (Bogota Metropolitan area) Initial investment Phase 1 - $240 million Phase 2 - $545 million Phase 3 - $1.3 billion Annual % energy reduction 47% Project status Phase I - completed Dec 2000 Phase II- completed in 2006 Phase III - ongoing; due to be completed by 2015/16 Phase IV-VIII - Planned Project Summary The TransMilenio Bus Rapid Transit (BRT) system in the City of Bogota, Columbia, provides the city with an efficient and safe mass transit system that encourages high ridership.

About 1.5 million passengers travel on the system every day with the completion of its first two phases. The operation of the BRT system through a combination of advanced Euro II and III technology buses and improved operational efficiencies has played a clear role in reducing congestion throughout the city. The residents and visitors of Bogota are thus enjoying reduced travel time, cleaner air, and reduced accidents.

With the implementation of the system, there has been a 32% reduction in overall travel time, 40% reduction in emissions into the air because of scrapping of over 2100 old public service buses, 92% reduction in accident rates in the corridors where the TransMilenio system operates. Post-BRT Bogota has recorded significant fuel savings of 47% while increasing the throughput by 60%. With the successful registration of the Phase II-VIII of its BRT system with UNFCCC in 2006 1 , the city expects US$ 25 million CDM carbon credits by 2012.

Successful elements of the program include: strong leadership on the part of the City Mayor, careful design and planning, use of state of the art technology, establishment of a well-managed company, sound investment in infrastructure, and an efficient single fare pricing system. 1 United Nations Framework Convention for Climate Change (UNFCCC). http://cdm.unfccc.int/Projects/DB/DNV-CUK1159192623.07/view Bogota Case Study November 2009 ESMAP EECI Good Practices in Cities Page 2 1. Introduction Bogota, the capital city of Colombia, is located near the geographic center of Colombia, 2,640 meters (8,661 ft) above sea level.

It is the largest and most populous city in the nation, with an estimated 8.2 million inhabitants in the metropolitan area in 2007 and a population density of 3,912 inhabitants per square kilometer. Its economy generates 25% of Colombia‟s total GDP. The city‟s roads were highly congested with the significant growth in private car ownership and use. While private cars occupied 64% of the road space, they only represented 19% of the population, and the daily average commute time was 1 hour and 10 minutes each way. Other issues included high incidences of accidents and extremely high air pollution rates during peak travel hours.

By the end of the 1990s, Bogota‟s public bus transportation system suffered from underuse, with low quality service and efficiency. The average speed for public transportation was 10 km/hour and was reduced to 5 km/hour by traffic during peak hours. Passengers became increasingly frustrated by consistently long wait times for buses. To minimize waiting time, riders had to use the first bus available rather than wait for a less expensive bus to arrive. Without price regulations, private bus operators were free to hike up prices and charge far more than public bus operators.

Other public transportation issues included high incidences of accidents and extremely high air pollution rates during peak travel hours. 2 In 1998, Mayor Peñalosa launched a long-term urban mobility plan, as part of urban renewal strategy, consisting of a package of measures that would place restrictions on private automobiles, promote non-motorized transportation, and improve public transit by partly financing the infrastructure improvements. In 1999, after the new National Government rejected potential plans for a subway system, the Mayor of Bogota presented his plan for a Bus Rapid Transit (BRT) system, built upon the successful experience of Curitiba in Brazil.

The transition to an effective BRT system would help realize the Mayor‟s four main goals by: (i) improving public transport system with respect to efficiency, safety, speed, convenience and comfort ensuring high ridership; (ii) restricting private automobile use; (iii) expanding and improving bicycle paths; and (iv) enhancing public space. 2. Project Description and Design The original proposal of a public transit system that featured both heavy rail (Metro) and a network of buses was abandoned because it cost four times more than the proposed BRT system which required US$1-10 million/km to implement.

The Mayor envisioned the BRT system as the centerpiece of an overarching integrated mobility strategy that required that the institutional problems that led to price hikes on the part of small private operators were adequately addressed. The small bus owners and drivers fought against the proposal by coordinating worker strikes in an effort to block its ratification. 2 Lozano, 2003; Chaparro, 2002; Lieras, 2003. Adapted from, „The Economics of TransMilenio: A Mass Transit of Bogota. CEDE. August 2004.

Bogota Case Study November 2009 ESMAP EECI Good Practices in Cities Page 3 The Bogota BRT integrates the following four elements to ensure operational efficiencies of the BRT system: Infrastructure: The system consists of 22 central trunk corridors, feeder zones, terminal stations, pedestrian overpasses, plazas and sidewalks. The establishment of dedicated bus lanes, including new bus stations and integration stations located at the end of dedicated bus lanes, ensures a smooth transfer to feeder lines. Traditional buses are banned from operating in trunk corridors.

Fare System: Ticket booths at the stations allow passengers to pre-pay for Smart Cards (fare cards) that use a magnetic device to streamline the boarding process and optimize ticketing. Passengers can change from a local to an express bus as well as one route to another using the same electronic fare card that is automatically debited at the turnstiles that are used to direct passengers. Revenues from card sales are deposited in a trust fund, from which the operators are paid according to the rules set forth in the concession contracts. Bus Technology: The new buses use Euro II & III technology and operate on dedicated lanes 18 hours a day.

The capacity of each bus is 160 persons with platform level access including room for disabled persons. Feeder buses are new and have a capacity of 70-90 persons. Trunk buses use the central lanes of existing streets, longitudinally segregated from the general traffic. The system is supplemented by feeder buses, which run on local streets. Transit Management: The operational fleet center manages bus dispatch, informs passengers, produces reports, and maintains records. All buses are equipped with GPS (global positioning s …