The boTTom line The Kribi Gas Power Project was the first infrastructure project to obtain long-term, local- currency commercial financing in Cameroon on a project finance basis. An innovative structure supported by an IDA guarantee made this possible by covering local lenders against defined government defaults. By opening access to long-term financing in local currency, the project reduced its foreign exchange risk. Most importantly, it lowered end-user tariffs. Clara Alvarez is a senior infrastructure finance specialist in the Financial Solutions Unit of the World Bank’s Energy and Extractives Global Practice. Teuta Kaçaniku is an infrastructure finance specialist in the same unit.

The Kribi Gas Power Project: Private, local-Currency Financing made Possible through an iDA Guarantee background In the late 1990s the government of Cameroon initiated a reform to improve efficiency and increase private sector participation in the country’s power sector. The reform included new legislation, a new regulator, and privatization of SONEL, the state-owned integrated power utility, which was transferred to private management under a 20-year concession in 2001. The concessionaire, Energy of Cameroon (ENEO),1 was granted exclusivity over transmission and distribution of electricity and the right to develop and own up to 1,000 MW of generating capacity.

In the early 2000s the government of Cameroon decided to pursue the exploitation of offshore gas reserves for, among other things, incremental power generation. As a result, in March 2006, Perenco Cameroon, a subsidiary of French Perenco, signed a 25-year production-sharing agreement with Société Nationale des Hydrocarbures (SNH), the state-owned gas supplier, to exploit the Sanaga South gas field. That agreement was the basis for the later development of the Kribi Gas Power Project. 1 Known as AES SONEL at the time the concession was awarded in 2001, the name changed to ENEO when Actis acquired AES’s assets in 2014.

Actis owns 56 percent of ENEO; the government of Cameroon holds the remaining 44 percent. Project The Kribi Power Project (“Kribi”) is owned by the Kribi Power Development Company (KPDC), a public–private partnership created in 2008 by AES (56 percent) and the government of Cameroon (44 percent). AES formed KPDC when it was the majority shareholder of ENEO in order to increase ENEO’s generating capacity up to the 1,000 MW allowed. Kribi consists of a new 216 MW natural gas–fired power plant and an associated 100-kilometer transmission line. The total project cost was $350 million. Kribi sells all its electricity output to ENEO through a 20-year power purchase agreement.

Fuel is purchased under a 20-year take-or-pay gas sales agreement from SNH, which in turn procures the gas under another 20-year take-or-pay agreement with Perenco Cameroon. The government of Cameroon awarded Kribi to KPDC by virtue of ENEO’s right to develop and own up to 1,000 MW of generating capacity. To ensure efficiency and least cost, the engineering, procurement, and construction contracts for the power plant and transmission line were selected through a competitive bidding pro- cess under the procurement rules and supervision of the European Investment Bank.

Kribi was designed to satisfy base load for the time being and eventually, once additional hydropower is developed, to be used to meet peak demand and as spinning reserve.2 The electricity supply 2 “Spinning reserves” are plants synchronized with the grid and kept ready to respond within a few minutes of a sudden need.

A k n o w l e d g e n o t e s e r i e s f o r t h e e n e r g y p r A c t i c e 2015/42 A k n o w l e d g e n o t e s e r i e s f o r t h e n e r g y & e x t r A c t i v e s g l o b A l p r A c t i c e P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed 2 The Kr IB I GAs Power ProjeCT: Pr IvATe , LoCAL-CurrenCy F InAnCInG MADe Poss IBLe ThrouGh An IDA GuArAnTee “The Kribi Gas Power Project set a benchmark for local-currency private financing for infrastructure in Cameroon.” from Kribi allows ENEO to provide electricity equivalent to the average consumption of about 163,000 households.

With a levelized tariff of $0.128 per kilowatt hour, Kribi provides a relatively inexpensive thermal addition to Cameroon’s electricity system until additional hydropower resources can be developed. The average tariff at the time Kribi was designed and financed was $0.18 per kilowatt hour. The challenge Until 2011, most of the infrastructure financing in Cameroon was done on a corporate basis through equity and foreign-currency-de- nominated loans from international development finance institutions (DFIs). The only exception was the Dibamba thermal power plant, which was financed on a project finance basis with private equity and loans from DFIs denominated in foreign currency.

Local and international commercial banks had provided only short-term corporate financing. The government of Cameroon had a strong interest in local banks participating in the financing of Kribi. The government’s objective was twofold: (i) to introduce a local-currency component into the financing package in order to mitigate foreign-exchange risk (which is passed through to the tariff), and (ii) to develop the capacity of the local lending market in long-term project finance.

While local lenders had liquidity and strong interest in participat- ing in the financing of private projects, they suffered from structural and regulatory constraints that limited maximum maturities of the loan to seven years, which was insufficient for long-term Figure 1. Contractual structure of the Kribi Power Project Source: Authors.

Government of Cameroon (GOC) Indemnity Agreement IDA (Guarantor) KPDC (Borrower) and/or AES Kribi Holdings Local Loan Agreement • 14-year amortization with balloon at year 7 • Pre-packaged extension terms to year 14 • Good-faith undertakings to extend or refinance by year 7 Local Loan Purchase Agreement • Local lenders each have a right to require GOC to purchase their promissory notes at year 7 if local loan cannot be extended by local lenders • at par, or fair market value if in default • void if accelerated or KPDC is bankrupt Government Commitment Agreement Licenses, GSA Project Agreement • Representations and warranties • Covenants • Good-faith obligation to extend or refinance local loan by year 7 to avoid GOC purchases under local loan purchase agreement IDA Guarantee Agreement • Guarantee of payment by government of local loan’s share of specified government obligations under the government commitment agreement and local loan purchase agreement • Eligible local lenders only (excludes GOC) Local lenders (Beneficiaries) 3 The Kr IB I GAs Power ProjeCT: Pr IvATe , LoCAL-CurrenCy F InAnCInG MADe Poss IBLe ThrouGh An IDA GuArAnTee infrastructure financing needs.

Moreover, the fact that the govern- ment of Cameroon and associated entities (SNH and the national energy regulator) lacked a track record in private project financing created a high degree of uncertainty (perceived risk) among the local lenders. Thus, the challenge was to create a financial structure that was attractive for local lenders with relatively little experience in project finance, and that would overcome the restrictions on the tenor of local lending. The solution Kribi reached financial closing in August 2012.3 Its financing was structured with a debt-to-equity ratio of 75 to 25.

To attract local-currency-denominated debt from local commercial banks into the structure, the package included, as a risk-mitigation instrument, an $82 million guarantee from the International Development Association (IDA) of the World Bank. The debt has a 14-year maturity and consists of three tranches (table 1): (i) $86 million from the International Finance Corporation (IFC); (ii) $95 million from other DFIs; and (iii) a local-currency …