Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region

Washington, DC

Document overview

Original summary

This document is a technical assessment of the Results-Based National Urban Development Program in the Northern Mountains Region (RBNUDP-NM), a World Bank-supported initiative. It covers the program's strategic relevance, institutional context, and technical soundness for seven target cities. The program aims to strengthen the capacity of these cities to plan, implement, and sustain urban infrastructure through a performance-based transfer system. It targets a US$300 million budget and addresses the challenges of rapid urbanization and decentralization in Vietnam's poorer Northern Mountains region.

Key points

  • The program targets seven Northern Mountains cities (Dien Bien Phu, Bac Kan, Cao Bang, Thai Nguyen, Hoa Binh, Tuyen Quang, and Yen Bai) with a total budget of US$300 million.
  • It utilizes a performance-based transfer system to provide resources, clarify responsibilities, and improve planning and oversight for urban infrastructure.
  • The assessment evaluates the program's institutional arrangements, technical soundness of sub-projects, and expenditure framework.
  • The program addresses the challenges of rapid urbanization and the widening gap between infrastructure needs and resources in Vietnam's Northern Mountains region.

Written by DocuLuma editors from the document's full text.

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 1

Page 1 of 85 · Preview

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 2

Page 2 of 85 · Preview

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 3

Page 3 of 85 · Preview

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 4

Page 4 of 85 · Preview

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 5

Page 5 of 85 · Preview

Socialist Republic of Vietnam : Results-Based National Urban Development Program in the Northern Mountains Region — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 85. Download the original document to read the full content.

⬇ Download document

Page 6 of 85 · End of preview

The full document has 85 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

SOCIALIST REPUBLIC OF VIETNAM Results-Based National Urban Development Program in the Northern Mountains Region Technical Assessment April 28, 2014 PREPARED BY THE WORLD BANK P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed ii Table of Contents Executive Summary ........................................................................................................................................................... 1 A. Program Description .............................................................................................................................................

11 National urban program ............................................................................................................................................ 11 National Urban Development Program (NUDP) .............................................................................................. 12 Results-Based National Urban Development Program in the Northern Mountains Region (the Program) ............................................................................................................................................................... 13 B.

Program Strategic Relevance ............................................................................................................................. 14 National Context ......................................................................................................................................................... 14 Northern Mountains Cities ...................................................................................................................................... 15 Relevance of Strengthening Capacity of Cities ................................................................................................

15 Relevance of Investments to Poverty Reduction and Sustainable Growth .............................................. 16 C. Institutional Context.............................................................................................................................................. 16 Role of Ministry of Construction ........................................................................................................................... 16 City Mandates and Functions .................................................................................................................................

17 City Planning Framework ........................................................................................................................................ 18 City Fiscal Framework .............................................................................................................................................. 19 CPC Administrative Structure and Staffing ....................................................................................................... 22 D. Program Institutional Arrangements ................................................................................................................

25 General Implementation Arrangements............................................................................................................... 25 Roles of Program Implementing Institutions ..................................................................................................... 26 Sub-Project Preparation Process ............................................................................................................................ 29 Sub-Project Implementation ....................................................................................................................................

31 Capacity and Experience of MOC ........................................................................................................................ 33 Consultants and Contractors ................................................................................................................................... 39 E. Technical Soundness of Sub-Projects ............................................................................................................. 39 Planning and Sub-Project Selection Criteria ......................................................................................................

39 Assessment of the Proposed Sub-Projects .......................................................................................................... 42 F. Description and Assessment of Program Expenditure Framework ....................................................... 45 Program Budget Structure and Classifications .................................................................................................. 45 Program Financial Sustainability and Predictability ....................................................................................... 46 Adherence of Program Budgeted Expenditure and Execution to Government Priorities....................

52 Efficiency of Program Expenditures .................................................................................................................... 52 G. Results Framework, Monitoring and Evaluation ......................................................................................... 56 Program Requirements for Monitoring and Evaluation ................................................................................. 61 Existing M&E Capacity of the Cities ...................................................................................................................

62 iii Strengthening M&E Capacity................................................................................................................................. 62 H. Program Economic Evaluation .......................................................................................................................... 63 Rationale for Public Provision and/or Financing.............................................................................................. 63 Economic Impact of the Program ..........................................................................................................................

63 World Bank Value Added ........................................................................................................................................ 63 Results of Economic Evaluation ............................................................................................................................ 64 I. Technical Risk Rating .......................................................................................................................................... 69 J. Summary of Recommended Actions ...............................................................................................................

70 Annex 1 ..............................................................................................................................................................................

75 iv List of Abbreviations CPC City People’s Committee DLI Disbursement Linked Indicator DPI Department of Planning and Investment (Province) FY Fiscal Year GoV Government of Vietnam IRR Internal Rate of Return MOC Ministry of Construction MOF Ministry of Finance MUDP Management Board of Urban Development Projects NPV Net Present Value NUDP National Urban Development Program O&M Operations and Maintenance PAP Program Action Plan PforR Program-for-Results Financing PMU Project Management Unit POM Project Operational Manual PPC Provincial People’s Committee PPT Project Preparation Team PPTAF Project Preparation Technical Assistance Facility RBNUDP-NM Results-Based National Urban Development Program in the Northern Mountains Region SAV State Audit of Vietnam TABMIS Treasury and Budget management Information System UDA Urban Development Agency (of MOC) US$ United States Dollar VND Vietnamese Dong V …

Related documents

Will open at the source site: World Bank Open Knowledge Repository