Price Caps, Efficiency Payoffs, and Infrastructure Contract Renegotiation in Latin America
World Bank, Washington, DC

Page 1 of 28 · Preview

Page 2 of 28 · Preview

Page 3 of 28 · Preview

Page 4 of 28 · Preview

Page 5 of 28 · Preview

You have reached the preview limit
The free preview includes the first 6 pages of 28. Download the original document to read the full content.
⬇ Download documentPage 6 of 28 · End of preview
The full document has 28 pages. Downloads happen on the original source site.
Text excerpt
Excerpted from the original document (first part). Download the file or visit the source for the complete text.
,t,P5 a IdS POLICY RESEARCH WORKING PAPER 3129 Price Caps, Efficiency Payoffs, and Infrastructure Contract Renegotiation in Latin America Antonio Estache Jose-Luis Guasch Lourdes Trujillo The World Bank Infrastructure Vice PresiN August 2003 P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed POLIcy RESEARCH WORKING PAPER 3129 Abstract Twenty years ago, as the United Kingdom was getting region and a survey of the literature on efficiency gains, ready to launch the privatization of its public services, Estache, Guasch, and Trujillo assess the impact of this Professor Littlechild developed and operationalized the regulatory regime in Latin America.
They show that concept of price caps as a regulatory regime to control while the expected efficiency gains were amply achieved, for residual monopoly conditions in those services. Ten these gains were seldom passed on to the users. Instead years later, Latin American countries, as they embarked they were shared by the government and the firms. into their own infrastructure reforms, also adopted the Moreover, the adoption of price caps implied higher price cap regulatory model. Relying on a large data base costs of capital and hence, tariffs, and brought down on the factors driving contract renegotiation in the levels of investment.
This paper-a product of the Infrastructure Vice Presidency-is part of a larger effort in the vice presidency to improve knowledge of infrastructure needs. Copies of the paper are available free from the World Bank, 1818 H Street NW, Washington, DC 20433. Please contact Antonio Estache, room Fl1K-184, telephone 202-458-1442, fax 202-676-9594, email address [email protected]. Policy Research Working Papers are also posted on the Web at http://econ.worldbank.org. Jose-Luis Guasch may be contacted at [email protected]. August 2003. (19 pages) The Policy Researcb Working Paper Seoes disseminates the findings of work in progress to encourage the exchange of ideas about development issues.
An objective of the series is to get the findings out quickly, even if the presentations are less than fully polished. The papers carry the names of the autbors and sbould be cited accordinigly. The findiitgs, interpretations, and conclusions expressed in this paper are entirely those of the authors. They do not necessarily represent the view of the World Bank, its Executive Directors, or the countries they represent.
Produced by Partnerships, Capacity Building, and Outreach Price Caps, Efficiency Payoffs and Infrastructure Contract Renegotiation in Latin America* Antonio Estache, World Bank and ECARES, Universite Libre de Bruxelles aestache(worldbank.org Jose-Luis Guasch World Bank and University of California, San Diego jguasch(worldbank.org Lourdes Trujillo Departamento de Analisis Econ6mico Aplicado Universidad de las Palmas de Gran Canaria * This paper was prepared for the conference "The UK model of regulation: a retrospective of the 20 years since the Littlechild report" organized by the London Business School Regulation Initiative-CRI at City University in London on April 9, 2003.
The authors are grateful to I. Alexander, 0. Chisari, C. Crampes, N. De Castro, E. Engel, A. Galetovic, J.A. Gomez-Ibanez, A. Gomez-Lobo, J.J. Laffont, S. C. Littlechild, M. Rodriguez-Pardina and R. Schlirf and J. Stem for many discussions at various stage of the research covered here. 1. Introduction Until the 1990s, infrastructure services in most of Latin America were provided by state- owned enterprises with local, provincial or national service monopolies.
Throughout the 1980s, fiscal constraints had increasingly been inhibiting the public sector's ability to perform some of the basic operation and maintenance on infrastructure and to expand coverage of services to meet demand.' This slow-down led to a growing dissatisfaction among users, generating the necessary political momentum for reforms. Those reforms combined stabilization programs anchored on public sector expenditures with a new vision of the appropriate role of the state in the economy.
For most countries, the infrastructure reforms of the 1990s consisted essentially of a vertical and horizontal unbundling of the sectors into multiple business units-when allowed by country size-- and "privatization" of as many as possible of these business units. Competition for the residual monopolies through auctions was the first step towards improvements in efficiency levels in the sector. The reward for the winner was a long term contract with the often exclusive right to deliver the service.
The adoption of incentive-based regulatory regimes and the creation of regulatory agencies to enforce the regulation was the second step designed to ensure sustained efficiency gains in the sectors. UK-type price caps and the related revision processes were part of what increasingly looked like a "standard regulatory regime" in the region. Price cap revision timings "a la UK" had the advantage of allowing the governments to buy time to get the regulatory agencies in place and to get them going since in most cases the first scheduled tariff revisions were 5 years down the road. They also allowed governments the time to create the additional incentives for quick efficiency improvements.
At a very first glance, the story was a successful one. By the end of the 1990s, the reforms had generated total private infrastructure investments of US$360 billion. Moreover, there is ample evidence suggesting that the reforms, including the widespread adoption of prices caps, were generally associated with improvements in efficiency and reductions in the costs of producing many of the services. 2 A closer look at the stylized facts provides a somewhat more complex story. First, as impressive as they were, the private sector investment flows represented only about one third of ' According to Calderon, C., W. Easterly and L.
Serven (2002), public infrastructure investment reductions were used to ensure over 50% of the primary budget deficit during the 1980s and 1990s. 2 More specific examples are provided below. 2 the investment needs of the regions.3 Contrary to the hopes of many reformers, the private sector did not become the major financier of the sector, although there was rarely a call for private sector participation in projects in Latin America that went unanswered.4 Second, there was a downward trend in public infrastructure investment in the region. Yet, according to Calderon and Easterly (2002), private sector participation does not explain this downward trend in public infrastructure spending.
In fact there is little correlation. The evidence suggests that there was a lot of cream-skimming and that governments were left with the responsibility to meet the high costs and high risks associated with service needs of the weak cash flow operations, without the benefits of the intra-sectoral cross-subsidies of the past. Most often, countries offered only the crown jewels of their infrastructure to the private sector, usually because they brought substantial resources to the treasury, they were clearly attractive to the private sector, and the transaction and operation were financially viable.
Third, while there were widely noted improvements in efficiency, it is not clear, however, that the cost reductions were sufficient to compensate for the decline in total investment levels. Fourth, while evidence on the efficiency gains is increasingly widespread, the evidence that not much of these gains were shared with the users is growing just as fast. S Indeed, ther has been at best a weak correlation between the size of efficiency gains and decrease in tariffs. Also if coverage improved, it did not improve as much as expected. Coverage quickly expanded on unfulfilled demand with high commercial payoffs and then expansion trickled down very slowly along income levels, because pr …
Related documents

Participation in WTO Dispute Settlement : Complainants, Interested Parties, and Free Riders
Published by Oxford University Press on behalf of the World Bank
24 p. · PDF · 142.4 KB

Doing Business 2014 Economy Profile : New Zealand
World Bank Group, Washington, DC
106 p. · PDF · 1.2 MB

Malawi Economic Monitor, May 2017
World Bank, Lilongwe, Malawi
49 p. · PDF · 976.6 KB

Gabon Country Economic Memorandum
Washington, DC: World Bank
180 p. · PDF · 4.7 MB

More Than a Pretty Picture : Using Poverty Maps to Design Better Policies and Interventions
Washington, DC: World Bank
308 p. · PDF · 3.9 MB

Thirsty Business
Washington, DC: World Bank
32 p. · PDF · 1.1 MB
