Proven Delivery Models for LED Public Lighting
World Bank, Washington, DC
Document overview
Original summaryThis document presents a case study on the Public-Private Partnership (PPP) delivery model for LED public lighting in Birmingham, United Kingdom. The report details the development and implementation process of the project, including financing, procurement, and installation. It highlights the use of a special purpose vehicle managed by the Birmingham City Council and the significant energy savings expected. The project, part of a larger infrastructure modernization effort, aims to upgrade and maintain the city's streetlights over a 25-year period, with a focus on LED technology. The study is suitable for readers interested in public-private partnerships, infrastructure development, and energy-efficient lighting solutions.
Key points
- The Birmingham LED street lighting project is part of a larger public-private partnership for infrastructure modernization.
- The project involves the replacement and modernization of 97,000 streetlights over 25 years.
- LED technology is expected to provide a 50% energy saving compared to traditional lighting.
- The project is a pilot for Europe's first LED streetlight retrofit project financed through a PPP.
Written by DocuLuma editors from the document's full text.

Page 1 of 20 · Preview

Page 2 of 20 · Preview

Page 3 of 20 · Preview

Page 4 of 20 · Preview

Page 5 of 20 · Preview

You have reached the preview limit
The free preview includes the first 6 pages of 20. Download the original document to read the full content.
⬇ Download documentPage 6 of 20 · End of preview
The full document has 20 pages. Downloads happen on the original source site.
Text excerpt
Excerpted from the original document (first part). Download the file or visit the source for the complete text.
Knowledge Series 026/16 PROVEN DELIVERY MODELS FOR LED PUBLIC LIGHTING Public-Private Partnership Delivery Model: Birmingham, United Kingdom Case Study #4 P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed 2 | Energy Efficient Cities Initiative Ta b l e o f C o n T e n T s aCKnoWleDGeMenTs iii PUblIC-PRIVaTe PaRTneRsHIP DelIVeRY MoDel: bIRMInGHaM, UnITeD KInGDoM 1 Context 3 Tracing the Development and Implementation Process 4 Project Development 4 financing 6 Procurement 9 Installation 10 lessons learned 10 aCRonYMs anD abbReVIaTIons 12 Public-Private Partnership Delivery Model: Birmingham, United Kingdom i a C K n o W l e D G e M e n T s This case study was written by Pedzi Makumbe, Debbie K.
Weyl, Andrew Eil, and Jie Li, with funding from The World Bank’s Energy Sector Management Assistance Program (ESMAP) and the Community Development Carbon Fund (CDCF), both of which are multi-donor technical assistance trust funds administered by The World Bank. The work was led by ESMAP in close collaboration with the Social, Urban, Rural, and Resilience Global Practice (GSURR) and the Environment and Natural Resources Global Practice (GENDR) of The World Bank Group.
The authors would like to thank Anne Shaw, Acting Assistant Director, Transportation, Connectivity, and Economy Directorate, and Paul Laythorpe, Highways Electrical Asset Manager, Street Services Division, Birmingham City Council. The report benefited tremendously from support and comments by Rohit Khanna, Practice Manager, ESMAP (World Bank). It also significantly benefited from comments by Wendy Hughes, Lead Energy Economist; Ivan Jaques, Senior Energy Economist; Martina Bosi, Senior Energy Economist, ESMAP (World Bank); Ashok Sarkar, Senior Energy Specialist (World Bank); and Luiz Maurer, Principal Industry Specialist (Interna- tional Finance Corporation).
Public-Private Partnership Delivery Model: Birmingham, United Kingdom iii P U b l I C - P R I VaT e Pa R T n e R s H I P D e l I V e R Y M o D e l : b I R M I n G H a M , U n I T e D K I n G D o M Location City of birmingham, United Kingdom Project Dates 2007 to 2035 Project Size 97,000 points of light (57,000 from 2010 to 2015; 40,000 from 2015 to 2035) Implementing Agency birmingham City Council Funding Mechanism Public-private partnership Implementation/ Procurement Process a special purpose vehicle manages and delivers contract requirements overseen by the birmingham City Council Expected Energy Savings 50% With a population of 3.7 million people in England’s West Midlands region, the metropol- itan area of Birmingham is the United Kingdom’s second most populous urban region after London.
Birmingham spawned many science, technology, and manufacturing innovations during the Industrial Revolution; today, with manufacturing declining, Birmingham is reinventing itself and becoming an important international commercial and service center. However, like many former industrial city powerhouses, Birmingham’s industrial tax revenue base has eroded over the years while its expenses have increased. Thus, the city has struggled to properly maintain its aging public infrastructure, postponing needed maintenance and upgrades year after year.
Birmingham has approximately 2,500 kilometers of streets, roads, and urban highways, as well as 850 bridges, tunnels, and related transportation structures. At night the city is illuminated by 97,000 streetlights that are owned by the city. In the past, most of these were high-pressure sodium, mercury vapor, and metal halide lamps. Before the LED program, many of Birmingham’s streetlights were old and in need of replacement. In 2000–01, the Birmingham City Council (BCC) conducted a Best Value Review of highway maintenance in an attempt to solve some of the challenges identified above.
That review, and a subsequent review by BCC’s Audit Commission, concluded that City staff would be unable to carry out a step-wise improvement in the highway assets, and a cash infusion was needed to bring the asset to a reasonable standard.1 The Commission recommended that plans be drawn up for a Private Financing Initiative (PFI)—a public services contracting model in the United Kingdom based on the public-private partner- ship (P3 or PPP) model—in order to capitalize upgrades and modernization of streets, roads, tunnels, street lighting, and related assets.
PFI contracts are: Long-term contracts (typically 20–35 years) where the private sector constructs the project’s assets (for example a building) and raises the required funding, usually on a project finance basis (i.e., where contrac- tual payments from the public sector represent the primary security for funders)… By contracting in this way, the aim is to ensure that whole-life costs associated with such assets are minimized and required associated services are provided competitively. Wherever possible, contracts specify the outputs rather than the inputs associated with a particular project.
Public-Private Partnership Delivery Model: Birmingham, United Kingdom 1 Under PFI, a private sector firm creates and/or maintains the asset at its own cost. The public sector counterpart agrees to cover these costs over time, including the cost of capital, which is typically higher than if the public sector had funded the project itself. As long as the higher cost of capital is offset by greater efficiencies elsewhere, such projects still offer value for money for the public sector.2 The key advantage of PPP contracts from a municipal government point of view is the source of capital, which is typically the private sector.
National governments may also incentivize PPP contracts by offering supplementary grants. Hence, there is no need for the municipality to raise upfront capital. It is not surprising that the PPP approach strongly appealed to cash-strapped Birmingham’s City Council. Another appealing innovation of PPP contracts is that they shift technology and perfor- mance risk to the private sector. Payments can be withheld until an asset is refurbished or built to a specific performance standard. The government can impose strict penalties for poor performance during the operations and maintenance period.
The arrangement is attractive to the private sector looking to add that asset class to its portfolio as well. Thus, both the public and the private sector benefit from the PPP. The BCC, therefore, adopted a PFI contract approach to access significant private investment alongside national government support to fund the backlog of necessary maintenance, to upgrade key assets such as lighting to a higher standard, and to maintain these assets over the next 25 years. Using the PFI framework, Birmingham contracted with a private service provider, Amey plc, to repair, modernize, and maintain these assets over a 25-year period.
The value of the total contract is £2.7 billion (US$4.2 billion) of which US$117 million is for lighting.3 The whole contract covers a step-improvement in the highways network, the removal of the works backlog, and the maintenance and management of 2,500 kilometers of roads, 4,200 kilometers of footways, 97,000 streetlights, 76,000 street trees, 1,100 traffic light signals and over 850 bridges, tunnels and highway structures. The small but integral streetlight component of Birmingham’s PFI was Europe’s first LED streetlight retrofit project financed through a PPP. At the time of procurement, LED technology was not a widely used technology in the UK.
However, it was clear to the service provider that LED street lighting could offer substantial cost savings and was firmly on the ascendant, so Amey plc made a business decision to deploy it where appropriate. Another driver of the LED program for efficient …
Related documents

Participation in WTO Dispute Settlement : Complainants, Interested Parties, and Free Riders
Published by Oxford University Press on behalf of the World Bank
24 p. · PDF · 142.4 KB

Growth and Volatility Analysis Using Wavelets
World Bank, Washington, DC
33 p. · PDF · 448.9 KB

Integrating the Poor into Universal Health Coverage in Vietnam
World Bank, Washington DC
36 p. · PDF · 1.5 MB

Arab Republic of Egypt : Detailed Assessment Report on Anti-Money Laundering and Combatting the Financing of Terrorism
Washington, DC
223 p. · PDF · 1.7 MB

Mexico : Accounting and Auditing
Washington, DC
21 p. · PDF · 495.9 KB

Tenure Security and Land-Related Investment : Evidence from Ethiopia
World Bank, Washington, DC
36 p. · PDF · 1.6 MB