Original summaryThis report, published by ESMAP in June 2008, provides a comprehensive analysis of the institutional and financial framework for developing small hydropower in Peru. It covers the resource potential, technical capacity, economic and financial viability, regulatory environment, and barriers to development. Key sections detail the potential for small hydro projects, including those integrated into existing infrastructure and greenfield sites, and assess the technical capabilities for project identification, design, construction, and equipment manufacture. The report evaluates economic returns considering social and carbon benefits, and financial returns with attention to loan tenors and carbon finance. It also examines potential corporate investors, such as pension and asset funds, and the availability of financing. The institutional and regulatory framework is discussed, including the Renewable Energy Decree of May 2008, administrative requirements, and environmental regulations. Barriers—financial, regulatory, and technical—are identified with mitigation strategies. International experiences from Brazil, Chile, Sri Lanka, Turkey, and Zhejiang Province, China, are reviewed to draw lessons. The report concludes with recommendations for promoting small hydropower in Peru. It is intended for policymakers, investors, and development practitioners involved in renewable energy planning and implementation.
Key points
- The report identifies significant small hydropower potential in Peru, including projects in existing hydraulic infrastructure and greenfield sites.
- Economic viability is assessed with and without social and carbon benefits, showing improved returns when these are included.
- Financial viability is influenced by loan tenors, with longer tenors improving project feasibility.
- The Renewable Energy Decree of May 2008 introduces a premium auction mechanism to support renewable energy, including small hydro.
- Key barriers include low tariffs due to subsidized natural gas, lack of long-term financing, and regulatory issues such as capacity payments and water rights.
Written by DocuLuma editors from the document's full text.

Page 1 of 134 · Preview

Page 2 of 134 · Preview

Page 3 of 134 · Preview

Page 4 of 134 · Preview

Page 5 of 134 · Preview

You have reached the preview limit
The free preview includes the first 6 pages of 134. Download the original document to read the full content.
⬇ Download documentPage 6 of 134 · End of preview
The full document has 134 pages. Downloads happen on the original source site.
Text excerpt
Excerpted from the original document (first part). Download the file or visit the source for the complete text.
PERU Institutional and Financial Framework for Development of Small Hydropower June 26, 2008 ESMAP P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed - 2 - CONTENTS ABBREVIATIONS AND ACRONYMS......................................................................................................8 EXECUTIVE SUMMARY ...........................................................................................................................9 1 INTRODUCTION................................................................................................................................20 2 RESOURCE POTENTIAL AND TECHNICAL CAPACITY ........................................................22 2.1 THE POTENTIAL FOR SMALL HYDRO.................................................................................
23 2.1.1 Small Hydro Projects Incorporated in Existing Hydraulic Infrastructure ............................ 25 2.1.2 Greenfield Small Hydro Projects ......................................................................................... 26 2.1.3 The Potential Project Pipeline .............................................................................................. 26 2.2 TECHNICAL CAPACITY FOR SMALL TO MEDIUM-SIZED HYDROPOWER.................. 27 2.2.1 Project Identification, Design and Engineering ...................................................................
27 2.2.2 Construction and Equipment Manufacture........................................................................... 32 2.2.3 Technical Assistance and Training....................................................................................... 33 3 ECONOMIC AND FINANCIAL VIABILITY OF SMALL HYDROPOWER.............................36 3.1 THE BENEFITS OF HYDRO AND RATIONAL TARIFFS...................................................... 36 3.2 ECONOMIC VIABILITY OF SMALL HYDROPOWER PROJECTS...................................... 37 3.2.1 Economic Returns to Hydropower Development ................................................................
39 3.2.2 Economic Return Taking into Account Social Benefits (Psoc, Qsoc) ................................. 41 3.2.3 Economic Return Taking into Account Carbon Benefits (Pg, Qg) ...................................... 41 3.3 FINANCIAL VIABILITY OF SMALL HYDROPOWER PROJECTS...................................... 43 3.3.1 Financial Returns ................................................................................................................. 44 3.3.2 The Importance of Loan Tenors...........................................................................................
47 3.3.3 Impact of Carbon Finance on Financial Viability ................................................................ 48 3.4 POTENTIAL CORPORATE INVESTORS IN SMALL TO MEDIUM-SIZED HYDROPOWER....................................................................................................................................... 50 3.4.1 Pension Funds ...................................................................................................................... 51 3.4.2 Asset Funds .......................................................................................................................... 52 3.5 AVAILABILITY OF FINANCING FOR SMALL TO MEDIUM-SIZED HYDROPOWER....
53 3.5.1 Loan Maturities .................................................................................................................... 53 3.5.2 Risk Factors and their Mitigation......................................................................................... 54 3.5.3 Lending Requirements ......................................................................................................... 56 3.5.4 General Conclusions on Financing.......................................................................................
58 4 INSTITUTIONAL AND REGULATORY FRAMEWORK............................................................59 4.1 ELECTRICITY SECTOR BACKGROUND............................................................................... 59 4.2 RENEWABLE ENERGY DECREE OF MAY 2008 .................................................................. 60 4.3 ADMINISTRATIVE AND ENVIRONMENTAL FRAMEWORK FOR SMALL HYDROPOWER DEVELOPMENT......................................................................................................... 60 4.3.1 Administrative Requirements...............................................................................................
60 4.3.2 Regulation of Environmental Protection with Regard to Electricity Activities ................... 61 4.3.3 Local Requirements for Projects Under the Clean Development Mechanism..................... 62 4.4 REGULATORY FRAMEWORK ................................................................................................ 62 4.4.1 The Generation Market ........................................................................................................ 63 4.4.2 Capacity Payments ...............................................................................................................
64 4.4.3 Transmission ........................................................................................................................ 65 4.4.4 Water Rights......................................................................................................................... 65 4.4.5 Rights-of-Way...................................................................................................................... 66 5 BARRIERS AND THEIR MITIGATION .........................................................................................67 - 3 - 5.1 FINANCIAL BARRIERS ............................................................................................................
67 5.1.1 Low Tariff based on Subsidized Natural Gas ...................................................................... 67 5.1.2 Lack of Long-Term Financing ............................................................................................. 67 5.1.3 Transaction Costs of Financing............................................................................................ 68 5.1.4 Unrealistic Risk Assessments Based on Large Hydropower ............................................... 68 5.2 REGULATORY BARRIERS.......................................................................................................
69 5.2.1 Capacity Payment................................................................................................................. 69 5.2.2 Transmission ........................................................................................................................ 69 5.2.3 Connection Requirements by Distribution Companies ........................................................ 70 5.2.4 Water Rights......................................................................................................................... 71 5.2.5 Rights-of-Way and Community Intervention.......................................................................
72 5.3 TECHNICAL BARRIERS........................................................................................................... 72 5.3.1 Lack of Detailed Guidelines on Required Levels of Studies ............................................... 72 5.3.2 Absence of Clear Guidelines Regarding Environmental Flows........................................... 73 5.3.3 Limited Use of Standardized Designs, Costing Procedures Specifications and Contract Documents............................................................................................................................ 74 6 INTERNATIONAL EXPERIENCE................................... …
Related documents

Participation in WTO Dispute Settlement : Complainants, Interested Parties, and Free Riders
Published by Oxford University Press on behalf of the World Bank
24 p. · PDF · 142.4 KB

Doing Business 2014 Economy Profile : New Zealand
World Bank Group, Washington, DC
106 p. · PDF · 1.2 MB

Malawi Economic Monitor, May 2017
World Bank, Lilongwe, Malawi
49 p. · PDF · 976.6 KB

Gabon Country Economic Memorandum
Washington, DC: World Bank
180 p. · PDF · 4.7 MB

More Than a Pretty Picture : Using Poverty Maps to Design Better Policies and Interventions
Washington, DC: World Bank
308 p. · PDF · 3.9 MB

Thirsty Business
Washington, DC: World Bank
32 p. · PDF · 1.1 MB