Environmental Assessment

World Bank, Washington, DC

Environmental Assessment — page 1

Page 1 of 63 · Preview

Environmental Assessment — page 2

Page 2 of 63 · Preview

Environmental Assessment — page 3

Page 3 of 63 · Preview

Environmental Assessment — page 4

Page 4 of 63 · Preview

Environmental Assessment — page 5

Page 5 of 63 · Preview

Environmental Assessment — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 63. Download the original document to read the full content.

⬇ Download document

Page 6 of 63 · End of preview

The full document has 63 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

SKU K8811 EMERGING LESSONS SERIES NO. 3 THE INSPECTION PANEL Environmental Assessment P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed EMERGING LESSONS SERIES NO. 3 | The Inspection Panel Environmental Assessment April 2017 © 2017 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved 1 2 3 4 19 18 17 16 This work is a product of the staff of The World Bank Inspection Panel with external contributions.

The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denomina- tions, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved.

Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) http:// creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution—Please cite the work as follows: Inspection Panel. 2017. “Environmental Assessment.” World Bank, Washington, DC.

License: Creative Commons Attribution CC BY 3.0 IGO Translations—If you create a translation of this work, please add the following disclaimer along with the attribution: This translation was not created by The World Bank and should not be considered an official World Bank translation. The World Bank shall not be liable for any content or error in this translation. Adaptations—If you create an adaptation of this work, please add the following disclaimer along with the attribution: This is an adaptation of an original work by The World Bank.

Views and opinions expressed in the adaptation are the sole responsibility of the author or authors of the adaptation and are not endorsed by The World Bank. Third-party content—The World Bank does not necessarily own each component of the content contained within the work. The World Bank therefore does not warrant that the use of any third-party- owned individual component or part contained in the work will not infringe on the rights of those third parties. The risk of claims resulting from such infringement rests solely with you.

If you wish to re-use a component of the work, it is your responsibility to determine whether permission is needed for that re-use and to obtain permission from the copyright owner. Examples of components can include, but are not limited to, tables, figures, or images. All queries on rights and licenses should be addressed to the Publishing and Knowledge Division, The World Bank, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; e-mail: pubrights @ worldbank.org Cover photo: © World Bank/Inspection Panel. Further permission required for reuse.

The cover photo was taken by the Inspection Panel during its investigation of a complaint related to the Private Power Generation Project in Uganda. Cover design: Bill Pragluski, Critical Stages, LLC.

Emerging Lessons Series: Environmental Assessment iii Contents Executive Summary iv Abbreviations vi Introduction 1 Methods 3 Results 4 Project Preparation 5 LESSON 1: Adequate Screening and Scoping Provide the Foundation for a Robust Environmental Assessment Process 5 LESSON 2: Consideration of Both Social and Natural Impacts Should Inform Project Design 10 LESSON 3: Distinct Adverse Impacts Require Special Attention 13 LESSON 4: Impacts Can Materialize Under Different Financial Instruments 16 LESSON 5: Ensuring Borrower Capacity is Crucial for Effective Project Implementation 17 Project Implementation 21 LESSON 6: Effective Monitoring, Supervision, and Continuous Environmental Assessment Require Appropriate Expertise and Resources 21 Long-Term Impacts 25 LESSON 7: Ensuring Strong Protection for People and their Environment is Key for Sustainable Project Development Outcomes 25 Conclusions 27 Appendix A Summary of the World Bank Policy on Environmental Assessment 30 Appendix B List of Panel Cases Analyzed 34 Appendix C Summary of the Main Cases Studied 35 Appendix D Summary of the Discussion at the Release of Emerging Lessons Series No.

3: Environmental Assessment 49 Notes 51 Bibliography 52 Figure Figure 1 Frequency of Issues Identified in EA Cases 4 Table Table 1 Summary of Emerging Lessons from EA Cases 28 iv Emerging Lessons Series: Environmental Assessment Executive Summary This report on environmental assessment (EA) is the third in a series to be pub- lished by the World Bank’s Inspection Panel drawing on the main lessons that have emerged from its caseload over 23 years.

With these reports, the Panel aims to contribute to institutional learning at the World Bank and in the larger development community by highlighting areas where improvements can enhance the social, environmental, and overall sustainability of Bank-funded operations, further development effectiveness, and enhance transparency. The Inspection Panel was created in 1993 by the World Bank’s Board of Executive Directors to receive and investigate complaints submitted by peo- ple actually or potentially suffering harm allegedly caused by Bank projects. Since then, the Panel has received 118 Requests for Inspection. Of those, 87 have been registered and 34 investigated.

Of the 34 cases investigated, 29 have involved issues related to environmental assessment, defined as the process of identifying, predicting, evaluating, and mitigating the natural, social, and other relevant impacts (both positive and neg- ative) of development proposals prior to making major decisions and commit- ments. Two of the Panel’s eligibility reports were also considered for this publication to illustrate additional important lessons. These 31 cases covered 27 countries in six regions. Most of the issues represented in these cases involved adequate screening and scoping, and the consideration of both social and natu- ral impacts.

While all relevant Panel cases were studied as part of this report, a special emphasis was put on drawing lessons from cases within the past decade. This report draws the following main conclusions from the cases: • Panel cases show the importance of a continuous environmental assess- ment process throughout the project cycle. This includes conducting quality impact assessments during project preparation as well as adequate follow-up on issues arising during implementation.

Thorough assess- ments that integrate natural and social impacts are both required and essential to anticipate issues, plan proper mitigation measures, deal with problems that arise in an effective and timely manner, and ensure project sustainability in the long term. • Strong supervision is crucial. This includes on-site verification when problems are identified, multidisciplinary expertise that goes beyond engineering to environmental and social issues, and continuous dialogue to close potential gaps between the reality on the ground and perspectives of the project team.

• Many of the issues found in Panel cases relate to the importance of con- sidering the social dimensions of a project, and the Panel’s experience suggests that lapses in analyzing social risks and impacts can create or exacerbate already complex situations. • Not only high-risk (Environmental Category A) projects have the poten- tial to cause sig …

Related documents

Will open at the source site: World Bank Open Knowledge Repository