This World Bank report, published in 2009, provides a comprehensive infrastructure strategy for the Southern Mongolia region, focusing on the development of mining resources such as coal and copper. It covers key sectors including mining, housing and urban infrastructure, land transport (railways and roads), electricity, water resources, social issues, environment, and planning institutions. The report presents data on potential mine production volumes, employment estimates, and population growth projections, and outlines investment needs exceeding US$5 billion for infrastructure to support annual revenues of over US$5 billion from mining. It evaluates different models for town development, compares transport options, assesses electricity supply alternatives, and discusses water resource management. The document is intended for policymakers, planners, and stakeholders involved in Mongolia's mining sector and infrastructure development, offering practical guidance and priorities for implementation.

Key points

  • Southern Mongolia's mines could generate annual revenues exceeding US$5 billion, requiring over US$5 billion in infrastructure investment.
  • Coal production could reach 45 million tonnes per year, with China as a key market for coking coal imports.
  • Town development by 2015 might require US$1.4 billion in investment, with population growth estimated at eight times mine employee numbers.
  • The report compares transport options, emphasizing rail freight costs as critical for coal exports.
  • Water resource management and institutional planning are highlighted as essential for sustainable development.

Written by DocuLuma editors from the document's full text.

Southern Mongolia Infrastructure Strategy — page 1

Page 1 of 106 · Preview

Southern Mongolia Infrastructure Strategy — page 2

Page 2 of 106 · Preview

Southern Mongolia Infrastructure Strategy — page 3

Page 3 of 106 · Preview

Southern Mongolia Infrastructure Strategy — page 4

Page 4 of 106 · Preview

Southern Mongolia Infrastructure Strategy — page 5

Page 5 of 106 · Preview

Southern Mongolia Infrastructure Strategy — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 106. Download the original document to read the full content.

⬇ Download document

Page 6 of 106 · End of preview

The full document has 106 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

Southern Mongolia infraStructure Strategy 1 Southern Mongolia infraStructure Strategy P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed Southern Mongolia infraStructure Strategy 2 © 2009 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved This volume is a product of the staff of the International Bank for Reconstruction and Development / The World Bank.

The findings, interpretations, and conclusions expressed in this volume do not necessarily reflect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law.

The International Bank for Reconstruction and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center Inc., 222 Rosewood Drive, Danvers, MA 01923, USA; telephone: 978-750-8400; fax: 978-750-4470; Internet: www. copyright.com. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2422; e-mail: [email protected].

Southern Mongolia infraStructure Strategy 3 table of contentS Acknowledgements 5 Executive Summary 6 Mining in Southern Mongolia 6 Town Development 7 Railways and Roads 9 Electricity 12 Water Resources 15 Social Issues 16 Environment 17 Financing 17 Institutions 18 1. introduction 20 2. Mining in Southern Mongolia 22 2.1. Major mines of Southern Mongolia 22 2.2. Markets for Mongolia’s coal 27 2.3. Markets for Mongolia’s copper 28 3.

houSing and urban infraStructure 30 3.1 Population growth 30 3.2 Different models for mining settlements 32 3.3 Options for planning and providing urban services 34 3.4 Planning towns in Southern Mongolia 39 3.5 Current Priorities 42 4 land tranSPort 43 4.1 The choice between road and rail 43 4.2 Possible railway destinations 44 4.3 Regulation of private railways 50 4.4 Roads 52 4.5 Trucking and Logistics 53 4.6 Current priorities 54 5 electricity 55 5.1 Existing electricity and heating systems 55 5.2 Demand forecasts 56 5.3 Supply options 57 5.4 Assessment of supply options 60 Southern Mongolia infraStructure Strategy 4 5.5 Investment plan and costs 63 5.6 Tariffs 64 5.7 Impact of Chinese Imports for Oyu Tolgoi 65 5.8 Current Priorities 65 6 Water reSourceS 66 6.1 Demand for water resources 66 6.2 Groundwater potential supply 68 6.3 Long distance surface water pipelines 73 6.4 Comparison of groundwater versus surface water pipeline 73 6.5 Groundwater management 74 6.6 Current priorities 75 7 Social iSSueS 77 7.1 Sharing the Benefits of Mining Development 77 7.2 Providing Adequate Social Services 82 7.3 Protecting Vulnerable Groups 85 7.4 Current Priorities 89 8 environMent 90 8.1 Land conversion and mine sites 90 8.2 Transport infrastructure 90 8.3 Road traffic 91 8.4 Energy 92 8.5 Water abstraction 92 8.6 Urban development 93 8.7 Induced development 93 8.8 Cultural and natural heritage 93 8.9 Current Priorities 94 9 Planning and inStitutionS 96 9.1 Tasks to be performed 96 9.2 Functions and required skills 97 9.3 Possible new institutions 102 9.4 Current Priorities 106 Southern Mongolia infraStructure Strategy 5 This World Bank report was written by Michael Warlters, leading a team that included Jim Reichert, Tony Whitten, Tumentsogt Tsevegmid, Graeme Hancock, Angela Khaminwa, Andrew Goodland, Erdene Ochir Badarch, Sunjidmaa Jamba, Nomuuntugs Tuvaan, Byambaatar Ichinkhorloo, Otgonbayar Yadmaa, Daniel MacDonald, and Bolormaa Gurjav.

• The report draws on background studies written by various authors: • Land transport – Richard Bullock of Bullpin Consulting; • Urban infrastructure – Denzel Hankinson and David Ehrhardt of Castalia; • Electricity – William Derbyshire of Economic Consulting Associates; • Water resources – Albert Tuinhof and Buyanhishig Nemer of Acacia Water; • Environment – Thomas Walton; • Community concerns –Bayan-Altai Luvsandorj; and • Social issues – Angela Khaminwa.

The report has also drawn on information provided in workshops held in Mongolia, in May, September, and October 2008, and April 2009; a study tour to Australia in November 2008; and information provided by various mining companies in Mongolia including Ivanhoe Mines, Rio Tinto, Energy Resources, MAK, and SouthGobi Sands. The workshop proceedings and background studies are available at www.worldbank.org/southgobi. The report was prepared by the World Bank with financial support from the Public-Private Infrastructure Advisory Facility (PPIAF) and the Australian Government’s AusAID – East Asia and Pacific Infrastructure for Growth Trust Fund.

acknoWledgeMentS Southern Mongolia infraStructure Strategy 6 The signing on October 6, 2009 of an investment agreement for the development of a copper and gold mine at Oyu Tolgoi marks a turning point in Mongolia’s history. As Mongolia begins to emerge from the Global Financial Crisis, the country’s decision-makers can turn their attention to the plans, institutions and investments needed to support the country’s tremendous growth potential. If the right steps are taken, within a few years, the mines of Southern Mongolia could be generating annual revenues of more than US$5 billion. But in order to make this a reality, more than US$5 billion of infrastructure investment will be needed.

This will be a huge challenge, in a country with a GDP of around $5 billion, and with a Government deficit of 8.2 percent of GDP in June 2009. Beyond the signing of investment agreements for the proposed mines of Southern Mongolia, the Government will need to make plans for the construction of towns, energy and transport facilities, and management of water resources. The social and environmental impacts of the mines, supporting infrastructure, and population influx will need to be managed. Laws and regulations governing infrastructure investment and regulation will need to be developed or amended, to provide a reasonable balance between the interests of private investors and the Government.

And institutions will ExEcutivE Summary need to be established that can manage all of these steps, and carry them forward as quickly as possible. Mining in Southern Mongolia The table below sets out preliminary estimates of production volumes from the major mines in Southern Mongolia. Coal production in the region could reach 45 million tonnes per year, of which 14,000 tonnes of steam coal production from Shivee Ovoo is currently intended to be converted into electricity for export to China. Over the next five to ten years, the Chinese market might absorb about 20 million tonnes of coking coal imports per year, with Mongolia in a good position to dominate China’s import market.

The market for steam coal is much more marginal, with China having a lot of cheap domestic production of steam coal. The cost of production of Southern Mongolia’s coal will be in the order of $10-$30/tonne. The cost of …