This report, prepared by the World Bank in 2001, analyzes the institutional and policy constraints hindering Nepal's hydropower development and proposes a comprehensive reform strategy. It covers the current state of Nepal's power sector, including its vast hydropower potential (43,000 MW) versus limited installed capacity (319 MW), low per-capita electricity consumption, and poor rural access. The report identifies four key constraints: overlapping roles of public institutions, inadequacies in the Nepal Electricity Authority (NEA), insufficient arrangements for power trade, and weak institutional support for rural electrification. It offers detailed recommendations, such as streamlining policy-making under the Ministry of Water Resources, restructuring NEA to attract private capital, creating a favorable environment for independent power producers to export to India, and introducing community-based systems for rural access. The document includes action plans, annexes on policy comments, institutional arrangements, and power trade frameworks. It is intended for policymakers, development practitioners, and energy sector analysts interested in Nepal's power sector reform and regional energy trade.

Key points

  • Nepal has an estimated hydropower potential of 43,000 MW but only 319 MW installed capacity, with 15% national and 5% rural electricity access.
  • The report identifies four main constraints: institutional overlaps, NEA's structural inadequacies, insufficient power trade arrangements, and weak rural electrification support.
  • Recommendations include separating policy, regulation, and operations; restructuring NEA with a private professional board; and promoting private sector export projects to India.
  • For rural electrification, the report suggests community-based systems and financial viability through cost recovery and targeted subsidies.

Written by DocuLuma editors from the document's full text.

Nepal : Proposed Power Sector Development Strategy — page 1

Page 1 of 75 · Preview

Nepal : Proposed Power Sector Development Strategy — page 2

Page 2 of 75 · Preview

Nepal : Proposed Power Sector Development Strategy — page 3

Page 3 of 75 · Preview

Nepal : Proposed Power Sector Development Strategy — page 4

Page 4 of 75 · Preview

Nepal : Proposed Power Sector Development Strategy — page 5

Page 5 of 75 · Preview

Nepal : Proposed Power Sector Development Strategy — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 75. Download the original document to read the full content.

⬇ Download document

Page 6 of 75 · End of preview

The full document has 75 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

Report No.

21912-NEP Nepal Proposed Power Sector Development Stirategy March 19, 2001 Energy Sector Unit South Asia Regional Office Document of the World Bank .: I .L "4m P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed ABIREVIATIONS AND ACRONYMS ADB = Asian Development Bank CEPA = Corsolidated Electric Power Asia CERC = Central Eectricity Regultory Commisson DANIDA Danish Intenafional Deveopment Assisnce DOED tDepatmt of Electricity Development EIA Environmental Impact Assessment EMS Enegy M anae t Systems EPC = Environmnt Protecton Council ESAP - Enery Sector Asionce Progm ESMAP = Energy Soctor Management Assistance Progrnmme ETFC Electricity Taiff Fixation Commission GOI Govemment of India GTZ Deutsche Gesellschaft fur Technische Zusamnm_eit GWh Gigawatt Hour HMGN = His Majesty's Government of Nepal HVPN Hana Vidyut Prsan Nigam Limited iFC = International Finance Corporation IPP = Independent Power Producer ISO Independent System Operator fW - Kreditanlt fur Wiederaufbau kV Kilovolt KW = Kilowatt LDC = Load Dispatch Center LNG 5 Liquefied Natural Gas MOPE Ministry of Population and Environment MOWR = Ministry of Water Resources NDC = National Development Council NEA = Nepal Electricity Authority NGENCO = Nepal Hydropower Generation Company NGO - Non-Governmental Organization NPC = National PInuing Commission NTPC = National Thermal Power Corporation o & M = Operation and Maintenance PLF Plant Load Factor PPA = Power Purhase Agreement R & R = Resettlement and Rehabilitation RLDC = Regional Load Dispatch Center RMB = Regional Maement Board ROR = Run-of-River S & MO = System and Market Operator SLDC State Load Dispatch Center T & D = Transmission & Distribution TFC = Tariff Fixation Committee USAID = United States Agency for International Development WCD = World Commission on Dums WECS Water and Energy Commission Secretariat WRC = Water Resources Council WRDC = Water Resources Development Council Vice President: Mieko Nishimizu Country Director: Kenichi Ohashi Sector Director: Alastair J.

McKechnie Team Leader: Tjaarda P. Storm van Leeuwen Task Leader: Mudasr Imran Abstract A major policy objective of the Government of Nepal is to develop the nation's vast hydro power resource potential to serve the electricity needs of the people, and to generate export revenue. While over the past years progress has been made in developing regulations and policies to attract investments for hydropower development, institutional constraints pose a challenge to implementation. This report attempts to analyze the key implementation constraints facing Nepal's hydropower development, and proposes options for reform.

The rationale for reform is embedded in the realization that the investment needs of the power sector are growing much faster than the financing capacity of the Government of Nepal, at a time when the availability of concessional multi- and bilateral resources for infrastructure investments is declining.

The report notes that among the key constraints the four most prominent ones inclwde: (i) overlaps in the policy, regulatory, and operational functions of public institutions operating in the electricity sector; (i) inadequacies of the existing institutional structure of the National Electricity Authority to meet future needs of the power sector; (iii) insufficient institutional arrangements for the promotion of power trade; and (iv) weak institutional support for improving electricity access to rural areas.

The report makes the following recommendations in the four areas listed * The role ofpolicy making should rest with the Ministry of Water Resources, with the possibility of the Department of Electricity Development and the Water and Energy Commission Secretariat given the role of executing bodies. The Electricity Tariff Fixation Committee should be redefined and over time be allowed to evolve into an independent regulatory authority. * While there are alternative institutional restructuring options for the Naiional Electricity Authority, certain common principles apply for private capital to be successfully mobilized.

These include: eliminating conflicts of interest; improving creditworthi,ness; improving opportunities for attracting private capital; and providing appropriate regulatory framework for the operation of the system and technical and commercial rules for grid operation. Reconstitution of the board of directors of National Electricity Authority with a private professional board could be a useful transition arrangement. * Nepal's comparative advantage in hydropower lies not as much in the cost of dleveloping hydro projects as it does in the fact that it is unencumbered by the complex Centre-State relationships, and inter-state water disputes that characterize the Indian situation.

The Government of Nepal has an opportunity to create a policy environment for independent power producers that is more favorable than in India for the development of medium sized dedicated export projects by the private sector. * To improve electricity access to rural areas, Nepal must supplement exisring institutional methods of delivering electricity services to rural areas with innovative appro,ches, such as by developing community based systems. Rural electrification business must befinancially viable for it to succeed. Efforts are needed to establish rules that allow cost recovery and possible mechanisms for providing subsidies for capital costs of new connections. CONTENTS Page No.

Executive Summary ................................................. i . Introduction .1 II. Overview of Nepal's Power Sector .2 Supplies and Resource Base .2 Demand and Prices .3 Market Balance .8 III. Main Issues and Challenges .............................................. 9 The Need for Investment ......................................... 9 The Challenge .......................................... 10 IV. The Roles and Responsibilities of Public Sector Institutions .. 1............................................ 1 Need for Introducing Institutional and Structural Changes .........................................

11 Streamlining Policy Making Bodies .12 Rationalize Planning .12 Separate Regulation from Policy .13 Improve Climate for Mobilizing Private CapitaL .14 Action Plan .15 V. Institutional Restructuring of NEA .. 15 Rationale for NEA Restructuring .15 Restructuring Options for NEA .16 Possible Issues Related to the Restructuring Options .17 Potential Benefits of Restructuring .19 Action Plan During the Transition Period .19 VI. Power Trade ................................................. 20 The Market for Exports ............................................ 20 Constraints on the Indian Market ............................................

21 Recent Developments in India - Improving Prospects for Trade ............................................ 22 Options for Increasing Power Trade ............................................ 24 Economic Benefits of Power Trade ............................................ 24 Action Plan ............................................ 25 VII. Rural Access to Electricity .......................................................... 26 The Challenge .......................................................... 28 Options for Improving Rural Access .......................................................... 28 Subsidies - Reaching the Poor ..........................................................

3 1 Establishing User Groups and Promoting Awareness Campaigns ......................................... 32 Action Plan .......................................................... 32 Annex 1: Hydropower Development Policy (2056) - Comments .................................................. 34 Annex 2: Existing Institutional Arrangements .......................................................... 41 Annex 3: The Inefficiencies in the NEA System ............ …

Related documents

Will open at the source site: World Bank Open Knowledge Repository