Nepal Contingency Planning Project

Washington, DC

Document overview

Original summary

This report, prepared by the World Bank Group in October 2010, presents a comprehensive contingency planning framework for Nepal to strengthen its financial crisis management capabilities. It covers three main areas: preconditions for effective crisis management, development of a crisis management framework, and a step-by-step action plan. Key topics include reforms in the legal, regulatory, and supervisory framework, enhancements to emergency liquidity assistance facilities, improvements in problem bank resolution, and legal reforms. The report provides specific recommendations such as confirming capital and liquidity ratios, expanding the Prompt Corrective Action Framework, centralizing liquidity monitoring, developing alternative bank resolution options, and establishing a Senior Policy Group for crisis coordination. It also outlines detailed actions for the weeks before, the first day, first week, and first month of a crisis, along with areas for possible support. The intended audience includes policymakers, central bank officials, and financial sector regulators in Nepal, as well as international development practitioners. The report is valuable for those involved in financial stability planning and crisis preparedness.

Key points

  • The report identifies preconditions for effective crisis management, including legal, regulatory, and supervisory reforms.
  • It recommends expanding the Prompt Corrective Action Framework to include liquidity ratios and other predictors of banking distress.
  • The report emphasizes the need for a centralized office in the NRB to monitor liquidity provision and improve data collection.
  • It proposes developing alternative bank resolution options and establishing a specialized bank restructuring unit.
  • The report outlines a step-by-step action plan for crisis response, covering the weeks before, first day, first week, and first month of a crisis.

Written by DocuLuma editors from the document's full text.

Nepal Contingency Planning Project — page 1

Page 1 of 53 · Preview

Nepal Contingency Planning Project — page 2

Page 2 of 53 · Preview

Nepal Contingency Planning Project — page 3

Page 3 of 53 · Preview

Nepal Contingency Planning Project — page 4

Page 4 of 53 · Preview

Nepal Contingency Planning Project — page 5

Page 5 of 53 · Preview

Nepal Contingency Planning Project — page 6
🛡

You have reached the preview limit

The free preview includes the first 6 pages of 53. Download the original document to read the full content.

⬇ Download document

Page 6 of 53 · End of preview

The full document has 53 pages. Downloads happen on the original source site.

Text excerpt

Excerpted from the original document (first part). Download the file or visit the source for the complete text.

THE WORLD BANK GROUP Nepal Contingency Planning Project Final Report October 31, 2010 The mission was composed of Shamsuddin Ahmad (World Bank—Task Team Leader), David S. Hoelscher (consultant), Valaria Salomao Garcia, Hisanobu Shishido, Sabin Raj Shrestha (all World Bank) and Anoop Raj Upreti (consultant) P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed 2 Contents Executive Summary ...................................................................................................................................

3 REVISED ACTION PLAN .............................................................................................................................. 9 I. Preconditions for Effective Crisis Management ................................................................................... 12 A. Reforms in the Legal, Regulatory, and Supervisory Framework ........................................................ 12 B. Reforms in the Emergency Liquidity Assistance Facilities .................................................................. 15 C. Reforms in Problem Bank Resolution Framework .............................................................................. 17 D.

Reforms in Depositor Protection ........................................................................................................ 20 E. Legal Reforms ...................................................................................................................................... 20 II. Crisis Management Framework .......................................................................................................... 23 A. Institutional Reforms for Crisis Management .................................................................................... 23 B.

Policy Preparation for Crisis Management ........................................................................................ 24 C. Preparation of Communication Strategy ............................................................................................ 27 III. Step-by-Step Action Plan ................................................................................................................... 28 A. Overview ............................................................................................................................................ 28 B.

In the Weeks before the Crisis ............................................................................................................ 28 C. First Day of the Crisis .......................................................................................................................... 31 D. First Week of the Crisis ...................................................................................................................... 34 E. First Month of the Crisis .....................................................................................................................

34 IV Areas for Possible Support .................................................................................................................. 36 Annex I: Managing the Bank Restructuring Process .............................................................................. 39 Annex II: Bank Resolution Options .......................................................................................................... 44 3 Executive Summary While important progress has been made in strengthening the financial stability framework, additional refinements are warranted.

Areas for strengthening include: (i) preconditions for effective crisis management; (ii) development of a crisis management framework; and (ii) preparation of a step-by-step plan for meeting the crisis. Preconditions for Effective Crisis Management Reforms are needed in the institutional and legal framework, facilities for liquidity provision, and bank resolution procedures. Legal, Regulatory, and Supervisory Framework Confirm capital levels: While reported capital levels appear adequate, there is a concern that those levels are overstated. A priority action for the NRB is to initiate a review of bank capital levels to ensure that reported capital levels are correct and appropriate.

Expand Prompt Corrective Framework: The current Prompt Corrective Action Framework (PCAF) refers only to required capital ratios. The NRB should have a PCAF for additional supervisory requirements that may prove to be better predictors of emerging banking distress, including liquidity ratios. Strengthen supervisory reporting: Reporting by banks and financial institutions remains cumbersome. Moreover, the financial institution report with much longer lags and sometimes in inconsistent formats, making bank comparisons and peer analysis difficult and inefficient.

Forward looking bank assessments: The current emphasis on compliance based supervision, where the supervisors primarily focus on compliance with existing prudential norms, should be supplemented with a forward looking bank-by-bank assessment. The working group on stress testing should be expanded to include responsibility for developing methodologies for such forward looking assessments and then work with bank desks to conduct such diagnosis. Reforms in the Emergency Liquidity Assistance Facilities Confirm liquidity ratios: The liquidity ratios should be confirmed. Ratios may be overstated to the extent that pledged securities cannot be considered liquid.

Centralize information on NRB liquidity provision: The NRB would benefit from having a centralized office to coordinate the monitoring of liquidity uses of banks. A single office could collect information on each bank about its use of the repo facility, the refinance facility, the Standing Liquidity Facility (SLF), and request for outright purchases. 4 Confirm the NRB’s policy of discounting government securities on demand. The liquidity ratios include government securities. Their inclusion assumes that the NRB will rediscount those securities on demand. That policy should be confirmed and publicized.

Forward looking liquidity monitoring: Liquidity gaps should be projected forward based on the current gap analysis framework. Discussions of possible liquidity stress should be discussed with the banks. Emergency Liquidity Facility: Emergency liquidity facilities are not meant just to help the individual bank but more importantly to buy time for the NRB to resolve problems in the illiquid bank and protect the overall banking system. The Bank Rate Facility provides such a role but the rules and procedures should be formulated in regulation. Moreover, the Bank Rate Facility current performs dual function of providing an indicative market rate and emergency liquidity facility.

Those two functions could be separated. Liquidity triggers: Banks that consistently borrow from the NRB are probably facing severe liquidity constraints. The NRB needs the authority to require corrective actions or even intervene in the bank if borrowing from the NRB exceeds predetermined levels. Reforms in Problem Bank Resolution Framework Insolvent banks should be resolved quickly: The practice of allowing insolvent banks to remain in the system during stable periods should be stopped. Such banks undermine the authority of the NRB and can distort market conditions. Treatment of shareholders: Shareholders should absorb the losses if their bank fails.

In the event of undercapitalization or insolvency, supervisors should require full shareholder recapitalization, and, if not forthcoming quickly, supervisors should intervene in the bank and sell it to third parties. The bank should not be returned to original shareholders. Strengthen management roster: The NRB staff should not manage banks under management contracts. The NRB should, therefore, identify a core group of potential bank managers that could include foreign managers and international m …

Related documents

Will open at the source site: World Bank Open Knowledge Repository