Access to Electricity in Afghanistan
Washington, DC : World Bank
Document overview
Original summaryThis World Bank report, published in April 2007, challenges the widely cited figure of 6% national electricity access in Afghanistan, arguing that actual access is higher, especially in urban areas. It compares data from household surveys (NRVA 2005 and KHEWS 2006) with utility data from Da Afghanistan Breshna Moassese (Breshna), revealing significant discrepancies. For instance, national survey data suggest 15.6% public grid access versus 11.2% from utility records, while in Kabul, survey estimates range from 58.7% to 68.2% compared to 34% from utility data. The report analyzes possible reasons for these gaps, including unregistered connections and poor record-keeping, and concludes that survey results likely reflect reality more accurately. It recommends measures to improve utility operations, such as conducting a comprehensive census of Kabul consumers, regularizing unregistered connections, computerizing records, and outsourcing meter reading. The document also stresses that despite higher access levels, electricity quality remains poor, with frequent outages and voltage fluctuations, severely constraining development. This report is valuable for policymakers, development practitioners, and researchers focused on Afghanistan's energy sector, offering data-driven insights and practical recommendations for improving utility management.
Key points
- Household surveys indicate national electricity access via the public grid is about 15.6%, significantly higher than the commonly cited 6%.
- In Kabul, survey-based access estimates (58.7% to 68.2%) are roughly double the utility-derived figure of 34%.
- Unregistered connections and poor utility record-keeping likely explain much of the discrepancy between survey and utility data.
- The report recommends a comprehensive consumer census, computerizing records, and outsourcing meter reading to improve utility operations.
- Despite higher access, electricity quality remains poor, with frequent blackouts and voltage fluctuations, hindering economic development.
Written by DocuLuma editors from the document's full text.

Page 1 of 4 · Preview

Page 2 of 4 · Preview

Page 3 of 4 · Preview

Page 4 of 4 · Preview
The full document has 4 pages. Downloads happen on the original source site.
Text excerpt
Excerpted from the original document (first part). Download the file or visit the source for the complete text.
national power system in Afghanistan according to data on power billed; it could be that Kabul is, in fact, even more significant in the national power system than the currently available data suggest. Without accurate data on the number of consumers on the system (as well as more detailed data on consumers’ locations on the system and relative levels of demand, and so forth), there is a high risk that investment and operational decisions could be misguided or suboptimal.
Specific measures to consider are: A comprehensive census of the Kabul power consumers to accurately re-assess the system and create an accurate and comprehensive customer database; Regularizing and/or disconnecting unregistered consumers; Computerizing record keeping and providing training for workers in using the computerized system.
At present, most data are recorded by hand and on paper, which leads to a high level of errors and giving a high level of discretion to bill collectors and other workers in the system who interface directly with consumers; Outsourcing meter reading and customer management (with incentives to reduce commercial losses) and installing an automated meter reading system for the larger-volume customers. Closing Thoughts Notwithstanding the higher-than-supposed level of access to electricity in Afghanistan, particularly in Kabul, it should be stressed that the electricity sector continues to severely constrain economic and human development in Afghanistan.
The power supplied is generally of poor quality, meaning fluctuating voltage levels (which damage machines and appliances), power surges, and blackouts are common. There are still extreme supply-side constraints for existing consumers (power from the public grid is available only a few hours daily in most places), to say nothing of the supply that would be required to fuel economic growth; and industrial load is virtually nonexistent. The high cost of private generation is prohibitive for most of the population, allowing for only very limited generation when the public supply is not available.
The government and its international partners need to keep a strong focus on addressing these fundamental problems while improving the operations of the national utility, Da Afghanistan Breshna Moassese (Breshna), in particular, dramatically improving the quality of data collection in the national power system. Introduction It is generally believed that Afghanistan has one of the lowest levels of access to electricity in the world; the figure of 6% access on the national level is often cited.
While it is certainly true that overall access to electricity is low in this overwhelmingly rural and poor country, a review of recent household survey data and updated national utility data suggests that the access to electricity is somewhat higher than has generally been supposed, particularly in urban Afghanistan. This note presents the new data and examines the implications of higher levels of access for policy makers and the managers of the power system in Afghanistan, particularly in Kabul. Recommendations to improve the quality of the utility’s knowledge of the power system in Kabul follow the analysis of the survey data.
Recent Household Surveys and Updated Utility Data Table 1 presents data on access to electricity in Afghanistan from the National Risk and Vulnerability Assessment (NRVA), a household survey, and from Da Afghanistan Breshna Moassese (Breshna), the national utility. The NRVA, a large nationwide survey carried out in 2005, showed access to electricity through the public grid (Breshna) of about 16%. ACCESS TO ELECTRICITY IN AFGHANISTAN: A REVIEW OF RECENT DATA AND RECOMMENDATIONS TO IMPROVE UTILITY OPERATIONS April 2007 In contrast, the estimate based on the most current Breshna data on residential consumers suggests an access level of about only 11% on the national level.
Of the urban households that participated in the survey, about 64% reported access to electricity through Breshna. Access to electricity in Kabul alone is presented in Table 2. In addition to the NRVA 2005 data and the Breshna utility data, the table shows data from a survey commissioned by the World Bank and carried out by the Central Statistics Office and Kabul University in August 2006 called the Kabul Household Energy and Water Survey (KHEWS). The data from the two household surveys that were carried out in Kabul suggest that the utility data on consumers underestimate the actual level of access by a degree even greater than was observed with the national-level data.
According to the results of the NRVA 2005 survey, about 59% of households reported access to electricity through Breshna. In August 2006, about 68% of the households that participated in the KHEWS reported access to electricity through Breshna, in contrast to the estimate of 34% that was derived from the Breshna utility data on residential consumers in Kabul.
Table 1: Access to Electricity in Afghanistan: Comparison of Survey and Utility Data n = Public Access (Breshna) % Access from any Source* % NRVA 2005 National data (including kuchis) 30,020 15.6 24.8 of which, Urban 5,755 64.2 73.0 of which, Rural 22,601 4.3 14.1 Breshna utility data (2007) National level** 435,433 11.2% — * For NRVA, “any source” includes public supply, government generator, personal generator (engine), personal generator (micro-hydro), community generator (engine), community generator (micro-hydro), solar. ** Extrapolation based on Breshna data on residential customers and population data from the Central Statistics Office.
If kuchi are excluded from this extrapolation (on assumption that kuchi would not consume power from public supply), the access rate becomes 11.9%.
The World Bank In Washington: Michael Haney Phone: 1-202-473-3680 E-mail: [email protected] Website: www.worldbank.org.af P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed Interpreting the Discrepancy between Utility and Survey Data As has been demonstrated by the data in Tables 1 and 2, there is a discrepancy between the level of access to electricity reported by people in household surveys, and the level of access to electricity that is derived from the Breshna data.
A few factors might account for the discrepancy between the Breshna data and the data gathered by the two household surveys. First, the estimate of 6% nationwide access was probably inaccurate even when it was calculated some years ago. This estimate was an extrapolation of poor quality data on registered utility customers that were available after the fall of the Taliban on average household size and the overall population. The household surveys, on the other hand, were designed to yield results that are representative of the general population, using established sampling and surveying methodologies.
Second, in the years of reconstruction, efforts by the Government of Afghanistan and Breshna to increase access have yielded some results in urban Afghanistan, and rural Afghanistan has seen a modest increase in access primarily thanks to the National Solidarity Program. Household Energy Survey being completed Third, the private efforts of individuals and domestic entrepreneurs have also contributed to the increased access to electricity and other energy services. Finally, some part of the discrepancy between the Breshna data and the survey data may be accounted for by unregistered connections to the public supply and/or poor record-keeping by the utility.
In this regard, the case of Kabul is of particular note: the percentage of households that reported access to Breshna in the World Bank KHEWS survey is twice the percentage of households with access according to the data from Breshna. The analysis o …
Related documents

Participation in WTO Dispute Settlement : Complainants, Interested Parties, and Free Riders
Published by Oxford University Press on behalf of the World Bank
24 p. · PDF · 142.4 KB

Growth and Volatility Analysis Using Wavelets
World Bank, Washington, DC
33 p. · PDF · 448.9 KB

Integrating the Poor into Universal Health Coverage in Vietnam
World Bank, Washington DC
36 p. · PDF · 1.5 MB

Arab Republic of Egypt : Detailed Assessment Report on Anti-Money Laundering and Combatting the Financing of Terrorism
Washington, DC
223 p. · PDF · 1.7 MB

Mexico : Accounting and Auditing
Washington, DC
21 p. · PDF · 495.9 KB

Tenure Security and Land-Related Investment : Evidence from Ethiopia
World Bank, Washington, DC
36 p. · PDF · 1.6 MB