Private Infrastructure in East Asia : Lessons Learned in the Aftermath of the Crisis
Washington, DC: World Bank
Document overview
Original summaryThis document, published by the World Bank, provides an in-depth analysis of private infrastructure development in East Asia, focusing on the lessons learned from the 1997 financial crisis. It examines the impact of the crisis on infrastructure investment trends and the role of private participation in infrastructure (PPI) in the region. The report analyzes the strengths and weaknesses of PPI models in six East Asian countries and draws policy lessons for governments and investors. It is intended for policymakers, investors, and development professionals interested in infrastructure development and the role of the private sector in emerging markets.
Key points
- The report analyzes the impact of the 1997 financial crisis on private investment in infrastructure in East Asia.
- It examines the two distinct models of private participation in infrastructure: privatization and public-private partnerships.
- The report focuses on six East Asian countries: Indonesia, Malaysia, the Philippines, the Republic of Korea, Thailand, and Vietnam.
- It provides policy lessons for governments and investors to improve the delivery of infrastructure services and mitigate future shocks.
Written by DocuLuma editors from the document's full text.

Page 1 of 93 · Preview

Page 2 of 93 · Preview

Page 3 of 93 · Preview

Page 4 of 93 · Preview

Page 5 of 93 · Preview

You have reached the preview limit
The free preview includes the first 6 pages of 93. Download the original document to read the full content.
⬇ Download documentPage 6 of 93 · End of preview
The full document has 93 pages. Downloads happen on the original source site.
Text excerpt
Excerpted from the original document (first part). Download the file or visit the source for the complete text.
WORLD BANK TECHNICAL PAPER NO. 501 Worlk in progro*s WTP50I for public discussion April 2001 Private Infrastructure in East Asia Lessons Learned in the Aftermath of the Crisis A W U~~~~~ri A/d -o Baietti P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed P ub lic D is cl os ur e A ut ho riz ed WORLD BANK TECHNICAL PAPER NO. 501 Private Infrastructure in East Asia Lessons Learned in the Aftermath of the Crisis A/do Baietti The World Bank Washington, D.C. Copyright C 2001 The International Bank for Reconstruction and Development/THE WORLD BANK 1818 H Street, N.W. Washington, D.C. 20433, U.S.A.
All rights reserved Manufactured in the United States of America First printing April 2001 1 2 3 4 04 03 02 01 Technical Papers are published to communicate the results of the Bank's work to the develop- ment community with the least possible delay. The typescript of this paper therefore has riot been prepared in accordance with the procedures appropriate to formal printed texts, and the World Bank accepts no responsibility for errors. Some sources cited in this paper may be informa ! docu- ments that are not readily available.
The findings, interpretations, and conclusions expressed in this paper are entirely those of the author(s) and should not be attributed in any manner to the World Bank, to its affiliated oiganiza- tions, or to members of its Board of Executive Directors or the countries they represent. The World Bank does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this volume do not imply on the part of the Worlc Bank Group any judgment on the legal status of any territory or the endorsement or acceptance of such boundaries.
The material in this publication is copyrighted. The World Bank encourages dissemination of its work and will normally grant permission promptly. Permission to photocopy items for internal or personal use, for the internal or personal ise of specific clients, or for educational classroom use, is granted by the World Bank, provided t iat the appropriate fee is paid directly to Copyright Clearance Center, Inc., 222 Rosewood Drive, Dan- vers, MA 01923, U.S.A., telephone 978-750-8400, fax 978-750-4470. Please contact the Copyi ight Clearance Center before photocopying items.
For permission to reprint individual articles or chapters, please fax your request with complete information to the Republication Department, Copyright Clearance Center, fax 978-750-44;'70. All other queries on rights and licenses should be addressed to the World Bank at the ad dress above or faxed to 202-522-2422. ISBN: 0-8213-4936-8 ISSN: 0253-7494 Aldo Baietti is a senior private finance specialist for the East Asia Private Sector Develoj ment unit at the World Bank. Library of Congress Cataloging-in-Publication Data has been applied for.
Contents Foreword v Abstract vi Overview 1 The Economic Context 3 The Crisis 3 Economic Recovery 4 Private Participation in Infrastructure 6 Impact of the Crisis on Infrastructure 7 Trends in Private Participation in Infrastructure Investment, 1994-99 9 Sector by Sector Overview 11 Power 11 Telecommunications 12 Tlransport 13 Water 13 Financing Structure and Terms 14 The Status of Reforms in East Asian Countries 1 5 Indonesia 1 6 Malaysia 1 7 The Philippines 17 Republic of Korea 18 Thailand 19 Viletnam 2 1 Lessons from the Crisis: How Should the Countries Respond?
23 Policy Lessons 2 3 The need for fundamental reforms 2 3 The choice of modalities for private participation in infrastructure 24 Finance or ownership? 26 Domestic financial markets and financial discipline 28 Management of contingent liabilities 29 Accountability 30 Foreign exchange planning and management 30 Lessons for Investors 31 The financing gap 31 Alternative models and cost-sharing partnerships 31 Risk mitigation 32 iii Notes 33 Annex Country Profiles 35 Annex Notes 73 References 81 Figures 1. Investment trend in private infrastructure in East Asia, 1994-99 10 2. Investment in private infrastructure projects in East Asia, by country, 1994-99 10 3.
Number of private projects closed in East Asia, by country, 1994-99 11 4. Investment in private infrastructure in East Asia, by sector, 1994-99 12 5. Number of private infrastructure projects in East Asia closed, by sector, 1994-99 12 6. Tradeoff between private financing and private participation in infrastructure 26 Tables 1. Indicators of economic growth and private infrastructure investments before and after the crisis 8 2. Private investment in infrastructure in East Asia, by sector, 1994-99 11 iv Contents Foreword In 1996 the Bank estimated East Asia's infra- in light of increased investment risk and structure needs over the next decade to be sharply rising costs.
A broader issue is the cur- enormous. The region would need to invest rent financial status of the public utilities- $1.2-1.5 trillion, the equivalent of 7 percent with or without private participation. Their of GDP, to sustain current and expected lev- deterioration in the wake of the crisis can pro- els of economic growth (World Bank 1996). foundly affect private sector activity in the These massive requirements were driven by various sectors, as well as the fiscal condition the region's rapid economic expansion, pop- of governments.
ulation growth, and urbanization; the need This report is part of an ongoing review for transition economies to make up for pre- of the models adopted in East Asia to promote vious underinvestment; and the expansion private participation in infrastructure (PPI). of trade and the globalization of the world It analyzes the impact of the financial crisis economy. It was clear that the governments on investment trends by private sponsors that had funded about 90 percent of these and assesses the strengths and weaknesses of investments in the past could no longer rise PPI models in six East Asian countries: to this challenge alone.
The private sector Indonesia, Malaysia, the Philippines, the would have to increase its role in financing Republic of Korea, Thailand, and Vietnam. and managing infrastructure services. The report then draws lessons from experi- W&hile initially cautious, private develop- ence in these countries to strengthen pri- ers and lenders responded enthusiastically, vate sector provision of infrastructure and making a substantial contribution to the infra- make a case for continuing fundamental structure needs of the region.
From the early reforms to improve the delivery of infra- 1990s private investment flows in infrastruc- structure services and soften the impact of ture rose steadily to an all-time high of$16.9 potential future shocks in the region. It is billion in 1996. Private investtnent expanded hoped that governnent leaders and PPI prac- in all infrastructure sectors, but principally for titioners will find this contribution useful. power generating plants and telecommuni- Aldo Baietti led the research for this cations systems. Lesser gains were made in the report and was the principal author. transport sectors and in water and sanitation.
Recognition should also be extended to a The financial crisis that emerged in mid- number of other World Bank staff and con- 1997 threatened to undermine much of the sultants involved in the work-Tomoko Mat- progress East Asia had made over the decade sukawa, Alberto Forchielli, Patricia Tse, in mobilizing private investment and financ- Mehrnaz Teymourian, Paolo Curiel, Ki-Jun ing for infrastructure. Investment levels have Chang, Wanda Ternau, Niro Rasanayagam, declined since the crisis, and many private Robin Sharma, J. P. Singh, Sati Achath, and projects have been reevaluated and cancelled PricewaterhouseCoopers, LLC.
Javed Harnid Director Private Sector Development East Asia and Pacific Region v Abstract Private participati …
Related documents

Participation in WTO Dispute Settlement : Complainants, Interested Parties, and Free Riders
Published by Oxford University Press on behalf of the World Bank
24 p. · PDF · 142.4 KB

Mapping Global and Regional Value Chains in SACU
World Bank, Washington, DC
124 p. · PDF · 4.7 MB

Contingent Liabilities Risk Management
World Bank, Washington, DC
46 p. · PDF · 1,008.8 KB

Building Informal Justice in Northern Kenya
World Bank and Legal Resources Foundation Trust, Nairobi
70 p. · PDF · 1.4 MB

Doing Business Economy Profile 2015 : Romania
Washington, DC
95 p. · PDF · 1.4 MB

Uruguay
World Bank, Washington, DC
104 p. · PDF · 1.3 MB
